IECC R402 / C402 · ASHRAE 90.1 envelope

How to read insulation R-value & U-factor tables by climate zone

Climate zones, cavity vs continuous insulation, window U-factors, and prescriptive vs performance compliance — how the energy code envelope tables work, with a worked example and a link to the free ICC viewer.

Need the actual tables? Read IECC Chapter 4 in the free ICC code viewer →

How to read the envelope tables, step by step

StepWhat you doWatch out for
1Find the climate zone for the county (IECC Chapter 3 table/map)A number (thermal) plus a letter (A moist, B dry, C marine); some tables split on the letter or on "marine 4"
2Decide residential vs commercial: R-chapter for low-rise dwellings, C-chapter (or ASHRAE 90.1) for everything elseApartments over three stories fall under the commercial provisions
3Pick the compliance path: prescriptive R-value table, U-factor/UA alternative, or performanceMixing paths component by component isn’t allowed unless the path permits trade-offs
4Find the component row (ceiling, wood-frame wall, mass wall, floor, slab, basement wall) and read the climate-zone columnCommercial tables also split by construction type (metal building, steel-framed, mass) and by roof type
5Read the notation: first number is cavity, "ci" is continuous insulation"20+5ci" means R-20 in the cavity plus R-5 continuous — not R-25 anywhere you like
6Read fenestration separately: maximum U-factor (lower is better) and SHGC where it appliesU-factor is the whole NFRC-rated unit, not the glass center
7Read the table footnotesFootnotes carry the exceptions (e.g., reduced attic R-value at raised-heel eaves, log walls, slab depth)

Our own summary, not the code text. Read IECC Chapter 4 (residential and commercial) in the free ICC viewer (codes.iccsafe.org); ASHRAE 90.1 is published by ASHRAE. Verify against the energy code edition — and any state amendments — adopted by your AHJ.

Which compliance path fits?

PathHow it worksWhen contractors use it
Prescriptive R-valueMeet or beat every component R-value in the tableSimple jobs; the inspector checks labels and cert cards
U-factor alternativeMeet the assembly U-factor for each componentNonstandard assemblies (SIPs, advanced framing, mass walls)
Total UA trade-off (REScheck / COMcheck)The whole envelope’s area-weighted UA must not exceed the code-reference house/buildingTrading more glass for better walls or attic
Performance (R405 / C407) or ERI (R406)Energy model shows proposed design uses no more energy than the standard referenceUnusual designs; mandatory provisions still apply
ASHRAE 90.1 (commercial alternative)Section 5 prescriptive tables by climate zone, or trade-off/modeling methodsOwners or engineers who design to 90.1 instead of IECC C-chapter

Our own summary, not the code text. Read IECC Chapter 4 (residential and commercial) in the free ICC viewer (codes.iccsafe.org); ASHRAE 90.1 is published by ASHRAE. Verify against the energy code edition — and any state amendments — adopted by your AHJ.

Worked example — new house in climate zone 5A, 2021 IECC prescriptive path

Input / stepValueSource
County lookupClimate zone 5AIECC climate zone table
Path chosenPrescriptive R-valueBuilder choice
Ceiling / attic insulationR-60R-value table, ceiling row, zone 5
Windows (whole-unit NFRC label)U-0.30 or lowerFenestration U-factor, zone 5
Submitted window: U-0.28Passes (0.28 ≤ 0.30)Lower U-factor is better
Attic with full-height R-49 over the top plate at the eavesMay satisfy the R-60 rowTable footnote exception

Worked example values only (2021 IECC). Look up the full tables in the ICC viewer and check state amendments.

Common field mistakes

MistakeWhat to do instead
Reading a higher U-factor as betterU-factor is heat flow — lower is better; R-value is resistance — higher is better
Adding cavity and ci together and installing all of it in the cavityContinuous insulation must be continuous across framing to count as "ci"
Using the county from the job name instead of the siteCheck the county the building sits in; a few counties straddle a zone line in newer editions
Assuming the model code is what’s enforcedMany states amend the IECC or stay on an older edition — energycodes.gov tracks adoption
Compressing batts at the eavesUse raised-heel trusses or baffles so the full depth reaches the wall line

Our own summary, not the code text. Read IECC Chapter 4 (residential and commercial) in the free ICC viewer (codes.iccsafe.org); ASHRAE 90.1 is published by ASHRAE. Verify against the energy code edition — and any state amendments — adopted by your AHJ.

📋 Embed this chart on your site — freeGet the code →

Paste this where you want the live chart to appear. It works on any site that allows iframes, and includes a link back to Field PM.

<iframe src="https://www.field-pm.com/embed/charts/insulation-r-values-iecc-climate-zones" title="IECC Insulation R-Values & Climate Zones — Field PM" width="100%" height="620" loading="lazy" style="border:1px solid #e5e7eb;border-radius:12px;max-width:560px;width:100%"></iframe>
<p style="font:13px/1.5 system-ui,sans-serif;margin:8px 0;color:#6b7280"><a href="https://www.field-pm.com/charts/insulation-r-values-iecc-climate-zones" target="_blank" rel="noopener">IECC Insulation R-Values & Climate Zones</a> by <a href="https://www.field-pm.com" target="_blank" rel="noopener">Field PM</a></p>

Reading the envelope tables like an inspector

Read the tables in the free ICC code viewer. IECC Chapter 4 holds the residential (R402) and commercial (C402) envelope tables. ASHRAE 90.1 Section 5 is the commercial alternative, sold by ASHRAE. This page explains how to use them; it does not reproduce them. Edition referenced: 2021 IECC, with notes on 2018 and 2024 — verify against the edition adopted by your AHJ, and check energycodes.gov for state adoption status.

Climate zone first. Every envelope number hangs on the zone: a thermal number (0 hottest to 8 coldest) and a moisture letter (A moist, B dry, C marine). Zones come from a county table, not your gut — two jobs an hour apart can land in different zones. The residential tables mostly key off the number; commercial tables also split by construction type, so a metal building and a wood-framed building in the same zone read different rows.

R-values vs U-factors. The R-value table lists minimum insulation you install, written as cavity plus continuous ("ci"). The U-factor table lists maximum heat flow for the whole assembly, which lets engineered assemblies comply even if they don’t look like the R-value row. Fenestration is always a U-factor — lower is better — and in warmer zones an SHGC limit applies too.

Worked example. A new house in zone 5A under the 2021 IECC prescriptive path: the ceiling row calls for R-60 and the fenestration column for U-0.30 or lower. A window labeled U-0.28 passes. A footnote lets full-depth R-49 that extends over the wall top plate at the eaves stand in for R-60, which is why raised-heel trusses matter. If the builder wants more glass than the prescriptive path tolerates, REScheck’s UA trade-off or the performance path is the way out — not skipping insulation.

Related references: the duct construction and Manual J/S/D guide (loads depend on this envelope) and the IBC fire-resistance ratings guide (foam plastic and exterior-wall assemblies carry fire rules too). Field PM keeps insulation certificates, photos before cover, and inspection results with the job so the energy inspection has its paperwork.

FAQ

How do I find my IECC climate zone?+

Look up the county in the climate zone table in IECC Chapter 3 (residential R301 or commercial C301). The zone is a number from 0 to 8 plus a moisture letter: A (moist), B (dry), or C (marine). Read it free in the ICC viewer at codes.iccsafe.org.

What does 20+5ci mean in the IECC table?+

It means R-20 of cavity insulation between the studs plus R-5 of continuous insulation installed across the framing, usually as foam or mineral-wool board on the exterior. The continuous layer cuts thermal bridging through the studs.

Is a lower U-factor better?+

Yes. U-factor measures how much heat flows through the window, so lower numbers mean better performance. Under the 2021 IECC in climate zone 5, residential windows must be U-0.30 or lower under the prescriptive path — check your adopted edition.

What changed for attic insulation in the 2021 IECC?+

The 2021 edition raised the prescriptive ceiling requirement in the colder zones — zone 5 went to R-60 from the R-49 in the 2018 edition — with a footnote that lets full-depth R-49 over the top plate satisfy it. The 2021 edition also added climate zone 0, which doesn’t occur in the U.S.

Do I have to use the prescriptive table?+

No. You can also comply with the U-factor alternative, a total UA trade-off (REScheck or COMcheck), or the performance path with an energy model. Mandatory provisions such as air sealing and duct testing apply on every path.

Built by a contractor, for the field

Field PM runs daily reports, job costing, QA/QC, and billing in one platform — $99/month with unlimited foremen, QA/QC, and safety free. 30-day trial, no credit card.

Start free trial →