Construction Overtime Cost Calculator

See what overtime really costs a crew: the premium at time and a half or double time, burden on the overtime, and the productivity you lose on long days. Get the cost per extra productive hour.

Rate
Crew and schedule

Your estimate

Cost per extra productive hour$85.50
Straight-time cost/hr
$51.30
Overtime cost/hr
$76.95
Premium per OT hour
$25.65
Overtime totals
Overtime hours paid480
Productive hours gained432
Hours lost to lower productivity48
Total overtime cost$36,936
Average overtime cost per week$6,156
Overtime premium (above straight time)$12,312
Extra cost vs the same productive hours at straight time$14,774
📋 Embed this calculator on your site — freeGet the code →

Paste this where you want the live calculator to appear. It works on any site that allows iframes, and includes a link back to Field PM.

<iframe src="https://www.field-pm.com/embed/free/overtime-cost-calculator" title="Overtime Cost Calculator — Field PM" width="100%" height="900" loading="lazy" style="border:1px solid #e5e7eb;border-radius:12px;max-width:560px;width:100%"></iframe>
<p style="font:13px/1.5 system-ui,sans-serif;margin:8px 0;color:#6b7280"><a href="https://www.field-pm.com/free/overtime-cost-calculator" target="_blank" rel="noopener">Overtime Cost Calculator</a> by <a href="https://www.field-pm.com" target="_blank" rel="noopener">Field PM</a></p>

How overtime cost is calculated

Straight-time cost per hour = wage × (1 + burden %). Burden is payroll taxes, insurance, benefits and any other labor add-ons you carry as a percent of wages. Use the labor burden calculator to work yours out.

Overtime cost per hour = wage × OT multiplier × (1 + burden %) when burden applies to the full overtime wage. Some burden items (certain benefits, for example) are paid per hour worked and not on the premium. Untick the box to burden only the straight-time part: wage × (1 + burden %) + wage × (multiplier − 1).

Productive hours = overtime hours × (1 − productivity loss %). Long days and long weeks tend to lower output per hour. The loss factor is your own estimate; there is no single right number, and it usually grows the longer overtime goes on.

Cost per extra productive hour = total overtime cost ÷ productive hours. Compare that with the straight-time cost per hour to see what you are paying to buy time. Field PM tracks crew hours by day so overtime shows up while it is happening.

FAQ

How do you calculate the cost of overtime?+

Multiply the base wage by the overtime multiplier (1.5 for time and a half, 2 for double time), then add burden. Multiply by the overtime hours. The premium is the extra over straight time: (multiplier − 1) × wage per hour, plus any burden that applies to it.

Does burden apply to overtime pay?+

Payroll taxes and many insurance costs are usually based on total wages, so they apply to the overtime premium too. Some benefits are paid per hour worked and do not grow with the premium. Check with your payroll provider and use the checkbox to match how your burden behaves.

Why include a productivity loss factor?+

Paid hours are not the same as productive hours. Long days and many weeks in a row tend to lower output per hour through fatigue, more mistakes and more rework. Enter your own estimate based on your experience; this calculator does not assume a number for you.

What is cost per extra productive hour?+

It is total overtime cost divided by the productive hours you actually get from it. It answers the real question: what does one more hour of useful work cost me if I buy it with overtime? Compare it with the straight-time cost per hour, or with the cost of adding workers.

Is overtime cheaper than adding more workers?+

Sometimes. Overtime avoids hiring, travel and training, and keeps an experienced crew together. Adding workers avoids the premium and fatigue but brings its own learning curve and site congestion. Run both, using this calculator for the overtime side and the per diem and travel calculator if extra workers would be traveling.

Stop running the numbers by hand

Field PM builds the math into the platform — job costing, billing, and forecasting from real field data. 30-day free trial, no credit card.

Start free trial →

Rated by contractors on

Field PM reviews on CapterraField PM reviews on GetAppField PM reviews on Software Advice