Free box fill calculator · NEC 314.16 · No signup
Count your conductors, grounds, devices, clamps, and fittings — get the required volume per NEC 314.16(B) and whether your box is legal, with the volume remaining.
Manufacturers stamp the cubic-inch volume inside the box. Add any marked plaster/extension ring.
Conductor allowances per NEC 314.16(B) — verify with your adopted edition. Common-box volumes are manufacturer-marked (Hubbell RACO spec sheets); always use the volume on the box in hand.
Paste this where you want the live calculator to appear. It works on any site that allows iframes, and includes a link back to Field PM.
<iframe src="https://www.field-pm.com/embed/free/box-fill-calculator" title="Box Fill Calculator — Field PM" width="100%" height="700" loading="lazy" style="border:1px solid #e5e7eb;border-radius:12px;max-width:560px;width:100%"></iframe> <p style="font:13px/1.5 system-ui,sans-serif;margin:8px 0;color:#6b7280"><a href="https://www.field-pm.com/free/box-fill-calculator" target="_blank" rel="noopener">Box Fill Calculator</a> by <a href="https://www.field-pm.com" target="_blank" rel="noopener">Field PM</a></p>
NEC 314.16(B) protects conductors from damage by limiting how full an outlet or device box can be. You give every item in the box a volume allowance based on conductor size, add them up, and compare the total to the volume marked on the box. For example, a 12 AWG conductor counts 2.25 in³ — larger conductors count more. This calculator applies the allowance for each size for you.
What gets counted: each conductor once at its own size (a wire passing straight through still counts once); all internal cable clamps together once, at the largest conductor; each support fitting such as a fixture stud or hickey once, at the largest conductor; each device yoke/strap twice, at the largest conductor landing on it; and all equipment grounds together once, at the largest ground. Pigtails that never leave the box aren't counted.
Overfilled boxes are one of the most common rough-in inspection failures. Field PM keeps your QA/QC checklists and inspection logs in the field app so the QA/QC walk catches it before the inspector does. For the box side of the math, use the cubic-inch volume the manufacturer marks on the box, and add any marked plaster or extension ring.
Add up a volume allowance for everything in the box, then compare the total to the box's volume. Each insulated conductor counts once at its own size. All internal cable clamps together count once, at the largest conductor size in the box. Each fixture stud or hickey counts once at the largest size. Each device yoke (a switch or receptacle strap) counts twice, at the largest conductor landing on that device. All equipment grounds together count once, at the largest ground. The total required volume must not exceed the box volume.
The allowance depends on the conductor size and is set in NEC 314.16(B) — for example, a 12 AWG conductor counts 2.25 in³. Bigger wire takes a bigger allowance. This calculator applies the allowance for each size automatically; check the table in your adopted edition for any size you need to confirm by hand.
A conductor running unbroken through the box counts as one volume allowance. A conductor that enters and terminates also counts as one. Pigtails and jumpers that don't leave the box are not counted.
All equipment grounding conductors together count as a single allowance of the largest ground (a separate isolated ground adds one more). Each device yoke (a receptacle or switch strap) counts as two allowances of the largest conductor connected to that yoke.
Use the cubic-inch volume the manufacturer stamps or prints inside the box — every listed box is marked. For a box with a plaster ring, extension ring, or domed cover that is itself marked with a volume, add that volume to the box. For ganged device boxes, add the volume of each section.
Field PM builds the math into the platform — job costing, billing, and forecasting from real field data. 30-day free trial, no credit card.
Start free trial →