Free store rollout cost calculator · No signup
Budget a multi-store program: cost per store, stores in each phase, the year each phase is built, escalation and contingency. Get the program total, spend by year and the all-in cost per store.
| Year | Stores | Spend |
|---|---|---|
| Year 1 | 45 | $21,829,081 |
| Year 2 | 60 | $29,635,271 |
| Year 3 | 55 | $27,980,635 |
Paste this where you want the live calculator to appear. It works on any site that allows iframes, and includes a link back to Field PM.
<iframe src="https://www.field-pm.com/embed/free/store-rollout-cost-calculator" title="Store Rollout Cost Calculator — Field PM" width="100%" height="1020" loading="lazy" style="border:1px solid #e5e7eb;border-radius:12px;max-width:560px;width:100%"></iframe> <p style="font:13px/1.5 system-ui,sans-serif;margin:8px 0;color:#6b7280"><a href="https://www.field-pm.com/free/store-rollout-cost-calculator" target="_blank" rel="noopener">Store Rollout Cost Calculator</a> by <a href="https://www.field-pm.com" target="_blank" rel="noopener">Field PM</a></p>
Phase cost in today's dollars = stores in the phase × cost per store. Cost per store is your all-in prototype number: construction, fixtures, equipment, permits, whatever your program carries per site.
Escalated phase cost = phase cost × (1 + escalation %)(year − 0.5). Each phase is escalated to the middle of the year it is built. Phase total = escalated cost × (1 + contingency %).
One-time program costs (prototype design, program management setup, a pilot study) are added once, in year 1, without escalation or contingency. Program total = sum of phase totals + one-time costs. All-in cost per store = program total ÷ total stores.
Real costs vary by site, region, building condition and landlord work, so treat cost per store as an average and check it against your pilot stores. For pacing and staffing the program, use the multi-site rollout planner; for a more detailed escalation spread, use the escalation calculator.
Start with an all-in cost per store from your prototype or pilot stores. Multiply by the number of stores in each phase, escalate each phase to the year it is built, add contingency, and add any one-time program costs. Then group the spend by year so finance can plan funding.
Whatever your program pays for at each site: construction, fixtures, signage, equipment, IT, permits, design fees and freight. Leave out anything paid once for the whole program and enter that as a one-time cost instead.
A store built in year 3 is built at year 3 prices. Escalating each phase to the middle of its build year gives a more realistic budget than applying one rate to the whole program, especially on long programs.
It depends on how well proven your prototype is and how much the sites differ. Programs with older buildings, landlord work or many jurisdictions usually need more. Your pilot stores are the best guide; this calculator uses the percent you enter.
Because it includes escalation, contingency and the one-time program costs spread across every store. That is the number to compare against the sales or savings each store is expected to bring.
Field PM builds the math into the platform — job costing, billing, and forecasting from real field data. 30-day free trial, no credit card.