Free construction cash flow + S-curve calculator · No signup

Free Cash Flow & S-Curve Calculator

Enter a contract value, spread it across the months with a distribution shape, and watch the draw schedule and cumulative cash-flow S-curve draw themselves — with peak draw, average draw, and total retainage held.

Peak month draw
$187,144
Avg month draw
$125,000
Total retainage held
$100,000
# Months
8

Monthly draw ($ billed / month)

peak $187,144
$0$94k$187kMo 1Mo 2Mo 3Mo 4Mo 5Mo 6Mo 7Mo 8

Cash-flow S-curve (cumulative %)

Cumulative billed
0%25%50%75%100%Mo 1Mo 2Mo 3Mo 4Mo 5Mo 6Mo 7Mo 8
PeriodBilling %Billing $Cum %Retainage $Net $
$56,6045.7%$5,660$50,944
$102,92316%$10,292$92,631
$153,32831.3%$15,333$137,995
$187,14450%$18,714$168,430
$187,14468.7%$18,714$168,430
$153,32884%$15,333$137,995
$102,92394.3%$10,292$92,631
$56,604100%$5,660$50,944
Total100%$1,000,000$100,000$900,000
📋 Embed this calculator on your site — freeGet the code →

Paste this where you want the live calculator to appear. It works on any site that allows iframes, and includes a link back to Field PM.

<iframe src="https://www.field-pm.com/embed/free/cash-flow-calculator" title="Construction Cash Flow / S-Curve Calculator — Field PM" width="100%" height="1120" loading="lazy" style="border:1px solid #e5e7eb;border-radius:12px;max-width:560px;width:100%"></iframe>
<p style="font:13px/1.5 system-ui,sans-serif;margin:8px 0;color:#6b7280"><a href="https://www.field-pm.com/free/cash-flow-calculator" target="_blank" rel="noopener">Construction Cash Flow / S-Curve Calculator</a> by <a href="https://www.field-pm.com" target="_blank" rel="noopener">Field PM</a></p>

How the cash-flow S-curve and draw schedule work

A draw schedule spreads the contract value across the months of the job as a billing percentage per period. Multiply each percentage by the contract value and you get the dollars you plan to bill that month — the monthly draw. Seed the shape from a bell, S-curve, front- or back-loaded, or linear distribution, then hand-edit any period you have firmer numbers for.

The cash-flow S-curve is the cumulative of those draws: add each month to the ones before it and the running total traces an "S" — slow at mobilization, steep through the peak, flattening at close-out. That is the single curve owners, GCs, and lenders read to see how much cash the job needs and when it needs it.

Retainage — the 5–10% an owner withholds from each payment until substantial completion — means your net cash each month is less than you billed, and the held amount only comes back at the end. Keep the schedule in a spreadsheet with the S-curve template, or let Field PM forecast the curve automatically from real billings and tie it to AIA G702/G703 pay applications.

FAQ

What is a construction cash flow S-curve?+

The S-curve is your cumulative billing plotted over the life of the job. Because most projects mobilize slowly, peak through the bulk of the work, and taper at close-out, the running total of dollars billed traces an "S". Owners, GCs, and lenders read that curve to see how much cash the project needs and when.

How do I build a draw (billing) schedule?+

Spread the contract value across the months of the job as a billing percentage per period, then multiply each percentage by the contract value to get the dollars you will bill that month. This tool seeds those percentages from a distribution shape, lets you override any row, and instantly rolls them up into the cumulative draw and cash-flow S-curve.

Which distribution shape should I use?+

Bell and S-curve suit most schedules — steady ramp-up, a peak mid-job, and a taper. Front-loaded fits jobs with heavy early mobilization, material buys, or stored-material billing; back-loaded fits work that lands at the end. Linear (even monthly billing) is a quick planning baseline. Start from a shape, then hand-edit the periods you have better numbers for.

How does retainage change the picture?+

Retainage is the percentage an owner withholds from each payment until the job is substantially complete — commonly 5–10%. It means your net cash in every month is less than what you billed, and the held amount is only released at the end. This calculator shows the retainage withheld and the net payment per period plus the total held across the job.

Can I download this as an Excel template?+

Yes — the free construction cash-flow S-curve Excel template builds the same draw schedule and cumulative curve with live formulas. Use the links below this calculator, or let Field PM forecast the curve automatically from your billings.

Stop running the numbers by hand

Field PM builds the math into the platform — job costing, billing, and forecasting from real field data. 30-day free trial, no credit card.

Start free trial →