Free working day calculator ยท No signup
Turn working days into a finish date, or count the working days between two dates. Pick a 5, 6 or 7 day workweek and list your holidays.
Sample dates only. Replace them with the holidays in your contract.
| Start | Mon, Nov 16, 2026 |
|---|---|
| Finish | Thu, Feb 11, 2027 |
| Non-work weekend days skipped | 24 |
| Calendar days per working day | 1.47 |
Paste this where you want the live calculator to appear. It works on any site that allows iframes, and includes a link back to Field PM.
<iframe src="https://www.field-pm.com/embed/free/workday-calendar-day-converter" title="Working Days to Calendar Days Converter โ Field PM" width="100%" height="860" loading="lazy" style="border:1px solid #e5e7eb;border-radius:12px;max-width:560px;width:100%"></iframe> <p style="font:13px/1.5 system-ui,sans-serif;margin:8px 0;color:#6b7280"><a href="https://www.field-pm.com/free/workday-calendar-day-converter" target="_blank" rel="noopener">Working Days to Calendar Days Converter</a> by <a href="https://www.field-pm.com" target="_blank" rel="noopener">Field PM</a></p>
A working day is a day the crew is scheduled to work. A calendar day is every day on the calendar, weekends and holidays included. Contracts and schedules use both, so it matters which one a duration is in.
Finish date: starting on the start date, the calculator steps forward one day at a time and counts only days that are in your workweek and not on your holiday list, until it reaches the number of working days. Calendar days = finish date โ start date + 1, counting both ends.
Working days between two dates: the same count, run from the start date to the end date. Untick "start date counts as day 1" if work begins the day after the start date, for example the day after notice to proceed.
The holiday list is yours to set; contracts and labor agreements differ on which days count. Weather days and other non-work days are not included unless you add them to the list. To see if a job is ahead or behind, use the schedule variance calculator.
Count forward from the start date, skipping days outside your workweek and your holidays, until you reach the number of working days. The calendar days are every day from the start date to that finish date, counting both ends. There is no fixed ratio, because it depends on where weekends and holidays fall.
Calendar days count every day, including weekends and holidays. Working days count only the days work is normally done. A 60 calendar day contract is much shorter than a 60 working day contract, so read the contract time clause carefully.
It depends on the contract. Many count the day of notice to proceed or the start date as day 1; others start the clock the next day. Use the checkbox to match yours.
The ones your contract or labor agreement says are non-work days. They vary by owner, region and union, which is why the list is editable. The sample dates are only a starting point.
Yes. Add any non-work date to the holiday list and it will be skipped like a holiday. Whether weather days extend the contract time is a separate question your contract answers.