Concrete Contractors

Know your yield before the next pour.

Concrete work lives and dies on labor productivity and quantities placed. Field PM captures daily pour logs, manhours and yardage by cost code, and productivity in real time — so a crew falling behind on cubic yards per hour shows up immediately, not at job close.

Manhours and yardage tracked on paper, totaled later
Productivity per crew is a gut feeling, not a number
Pour documentation scattered across phones
Progress billing rebuilt in Excel every month
Safety and inspection records hard to find at audit
01

Daily logs that capture placement

Foremen log manhours, quantities placed, weather, equipment, and photos from the phone in minutes. Hours and quantities roll into cost codes so the productivity picture is current — not reconstructed from notes a week later.

02

Productivity by cost code

See cubic yards or square feet per labor hour against budget for each cost code. A flatwork or formwork code drifting under your target surfaces while there's still schedule to recover, with the underlying daily entries one tap away.

03

Document the pour

Photos, weather, and notes attach to each daily report and live in the job book, giving you a defensible record of conditions and placement — useful when a slab is questioned months later.

04

Bill and close cleanly

AIA-style progress billing pulls from the budget with percent complete and retainage, QA/QC inspections and punch lists track to closure, and safety and OSHA records assemble as you go.

FAQ — Field PM for Concrete Contractors

Can I track yardage and manhours together?+

Yes. Daily reports capture both manhours and quantities placed against cost codes, so you get productivity (yards or SF per labor hour) per code without a separate spreadsheet.

How does productivity tracking help on concrete?+

Each cost code shows actual output per hour against your budgeted rate. A formwork or finishing code burning hours faster than planned surfaces early, with the daily entries behind it available to diagnose why.

Does it handle progress billing?+

Yes — AIA-style G702/G703 pay applications bill from the schedule of values with percent complete and retainage, exported as a clean PDF.

Is there a free trial?+

14 days, no credit card. Foremen and field crews are free and unlimited.

Built for Concrete Contractors

14-day free trial · no credit card · cancel anytime · unlimited foremen, QAQC, safety & subs always free.

Start free trial →