Civil Contractors

Dirt, quantities, and equipment — tracked daily.

Civil and site work runs on production quantities, equipment hours, and labor. Field PM captures all three on the daily report, ties them to cost codes, and surfaces productivity in real time so a phase falling behind on units per hour is visible the same week.

Quantities and equipment hours logged on paper
Equipment idle time invisible until billing
Productivity per phase unknown mid-job
Weather and delay documentation scattered
Progress billing rebuilt by hand each cycle
01

Capture production in the field

Foremen log manhours, quantities, equipment on site, materials, weather, and delays from the phone. Hours and quantities roll into cost codes so production tracking reflects today's dirt moved — not a reconstruction from a clipboard.

02

Equipment and delays on the record

Track equipment on each daily report and document weather and delays with photos and timestamps. When a delay claim or an idle-equipment question comes up, the defensible record already exists in the job book.

03

Productivity by phase

Units per labor hour by cost code shows which phases — excavation, grading, utilities, paving — are beating or burning the estimate, with the daily entries behind each number available to diagnose the trend early.

04

Bill and document

Progress billing pulls from the budget with percent complete and retainage, and safety, QA/QC, and the job book accumulate as the work happens so closeout and audits are painless.

FAQ — Field PM for Civil Contractors

Can I track production quantities and equipment?+

Yes. Daily reports capture manhours, quantities, and equipment on site against cost codes, so production and equipment usage are recorded in the field and roll into productivity tracking.

Does it work on remote sites with no signal?+

Yes — daily report drafts save offline and sync when the device regains signal, and the optional GPS time clock works the same way, which matters on spread-out civil sites.

How does productivity tracking apply to site work?+

Each cost code shows units (CY, SF, LF) per labor hour against budget, so phases like excavation, grading, or paving show early whether they're beating or burning the estimate.

Is there a free trial?+

14 days, no credit card. Field crews are free and unlimited.