Free project directory · Excel

Free Construction Project Directory Template

Every contact on the job in one printable list — owner, design team, engineers, GC, subs by trade, suppliers, inspectors, utilities, and emergency contacts — plus an emergency card that fills itself.

  • Owner, architect, engineers, and GC team sections
  • Subcontractors by CSI division
  • Suppliers, AHJ inspectors, and utilities
  • Emergency contacts: hospital ER, police, fire, utility lines
  • Role · company · name · office · cell · email · address
  • Printable emergency card for the trailer and gate
  • Landscape print with repeating header row

Project Directory

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

Project Directory

Every contact grouped by owner, design, engineers, GC, subs by trade, suppliers, AHJ, utilities, and emergency — with a live count of contacts filled in.

02

Emergency Card

One page to post: site address for 911 dispatch, nearest hospital, emergency and utility lines, and site leadership cells — pulled live from the directory.

03

Instructions

How to fill each section, revision control, day-one emergency prep, and printing.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What goes in a construction project directory?

Everyone you might need to reach on the job: the owner and their reps, the architect and engineers, the GC team, every subcontractor by trade, key suppliers, building-department and special inspectors, utility contacts, and emergency numbers — with role, company, name, office phone, cell, email, and address.

Who maintains the project directory?

Usually the GC's project engineer or APM. Whoever owns it should reissue it with a new revision number every time a contact changes, and make sure the field has the current version — not the one taped to the trailer wall in month one.

What emergency contacts should be posted on a jobsite?

911 first, then the site address to give dispatch, the nearest hospital with an emergency room (address and route), your occupational clinic, police and fire non-emergency lines, utility emergency lines for downed power lines, gas leaks, and water main breaks, 811, and site leadership cell phones. The Emergency Card tab pulls all of these from the directory onto one printable page.

Why are subcontractors listed by CSI division?

Ordering subs by CSI MasterFormat division (03 Concrete, 22 Plumbing, 26 Electrical…) lines the directory up with your spec book, subcontract log, and submittal log, so it is quick to find the right contact for a spec section.

One list, one revision, cell phones first

A construction project directory is the single contact list for everyone on a job — from the owner's rep and the architect to the electrical foreman, the building inspector, and the nearest emergency room. When it's current and in the field's hands, problems get solved with a phone call instead of an email chain.

This free template organizes contacts the way projects run, lists subcontractors by CSI division, and includes a printable emergency card. Use it to fill the attendee lists in your construction meeting minutes.

Field PM keeps the project team and contacts with the job so everyone in the field sees the current list — no reprinting.

Why every job needs one current project directory

At some point on every project, someone needs a phone number right now: the inspector who's supposed to be on site at 7, the electrical foreman whose crew just hit a line, the owner's rep who has to approve a change before the pour. If the answer is "it's in an email somewhere," you're losing time you don't have. A construction project directory — also called a project contact list or team roster — puts every contact on the job in one place, in one current version. The free template above organizes it the way projects actually run and adds a one-page emergency card for the trailer wall.

What's in the directory

The directory is grouped into sections, each with the same columns: Role, Company, Contact Name, Office Phone, Cell, Email, Address, and Notes.

  • Owner — project rep, facilities/operations, accounts payable (for pay apps), and any construction manager or owner's agent.
  • Architect / design team — principal, project architect for construction administration, interior and landscape designers.
  • Engineers & consultants — structural, civil, MEP, fire protection, geotechnical, surveyor, commissioning agent.
  • GC team — project executive, PM, project engineer, superintendent, assistant super, safety manager, QA/QC, project accountant.
  • Subcontractors by trade — ordered by CSI division, from demolition through site utilities.
  • Suppliers & services — distributors, ready-mix dispatch, rebar, rental equipment, crane service, dumpsters, fencing.
  • AHJ / inspectors & testing — permit desk, building, electrical, plumbing, and mechanical inspectors, fire marshal, special inspections, SWPPP, elevator.
  • Utilities — new-service contacts for electric, gas, water/sewer, telecom, and 811.
  • Emergency contacts — 911, nearest hospital ER, occupational clinic, police and fire non-emergency, utility emergency lines, Poison Control, the National Response Center for spills, and OSHA's severe-injury reporting line.

The emergency card

The second tab turns the directory into a one-page sheet to post in the job trailer, in gang boxes, and at the gate. It pulls the site address and gate access (the first thing 911 dispatch will ask for), the nearest hospital name, address, and phone, the emergency and utility lines, and the cell phones for the superintendent, safety manager, and PM — all with live formulas, so updating the directory updates the card. Add the route to the hospital and your muster point and first-aid/AED location by hand.

A few things experienced supers do on day one:

  • Drive the hospital route. Know whether the nearest hospital has an emergency room — an urgent care can't take a serious injury.
  • Know which injuries you must report. Under OSHA's recordkeeping rule (29 CFR 1904.39), employers report a work-related fatality within 8 hours and an in-patient hospitalization, amputation, or loss of an eye within 24 hours.
  • Call 811 before you dig and record the locate ticket number. Lead times vary by state.
  • Post the utility emergency lines for the site — downed lines and gas leaks don't wait for the office to open.

How to fill out the template

ColumnWhat to enter
RolePre-filled. Delete roles you don't need or type new ones into the blank rows in each section.
CompanyLegal or common company name — match your subcontract or PO.
Contact NameThe person you'll actually call. For subs, the foreman in the field (PM in Notes).
Office / CellCell first for field people. The office line won't answer at 6 AM.
EmailFor RFIs, submittals, and minutes distribution.
AddressOffice, yard, or — for the hospital — the ER entrance.
NotesHours, approval limits, license or permit numbers, preferred way to schedule inspections.

The project info block counts how many contacts are filled in so you can see at a glance how complete the directory is. Bump the Rev # every time you reissue.

Common project directory mistakes

  1. Only office numbers. Get the field cell for every foreman and super.
  2. No revision control. Three versions floating around means someone calls the inspector who retired last month.
  3. Missing the AHJ. The inspection request line and the inspector's cutoff time save days over a job.
  4. Emergency info buried on page 4. Emergency contacts belong on their own posted page — that's what the emergency card is for.
  5. Posting personal info publicly. Cell numbers and emails are personal information. Share the directory with the project team only.

Keeping it current without reprinting

A spreadsheet directory is only as good as the last time someone reissued it. Field PM keeps the project team, subs, and contacts with the job, so the field has the current list on their phone and the same records drive daily reports, safety forms, and RFIs and change orders. Start a free 30-day trial.