Free meeting minutes · Excel

Free Construction Meeting Minutes Template

OAC, subcontractor coordination, and foreman meeting minutes in one workbook — attendees, numbered old and new business, action items with days open, and an open action items roll-up across all three.

  • OAC, sub coordination, and foreman meeting tabs
  • Attendee list with attendance dropdown
  • Old business carried forward with original item # (e.g. 3.02)
  • New business auto-numbered from the meeting #
  • Action items: owner, due date, status, days open formula
  • Open Action Items roll-up with overdue flags
  • Next meeting block · print-ready landscape layout

Construction Meeting Minutes

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

OAC Meeting

Owner-architect-contractor progress meeting: attendees, old business, new business, action items, next meeting.

02

Sub Coordination

Weekly trade coordination: area hand-offs, MEP clashes, inspections, deliveries — same numbering and action tracking.

03

Foreman Meeting

Crew-level meeting with a Safety & Crew block for the weekly topic, near misses, manpower, equipment, and material needs.

04

Open Action Items

Every unclosed action from all three meetings in one list, with open and overdue counts, days open, and an OVERDUE flag.

05

Instructions

Numbering rules, how to carry items forward, writing action items, and typical agendas for each meeting.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What is an OAC meeting in construction?

OAC stands for Owner-Architect-Contractor. It is the regular progress meeting (usually weekly or every other week) where the owner, design team, and general contractor review safety, schedule, RFIs, submittals, change orders, quality, and payment. The GC typically runs the meeting and publishes the minutes.

How should construction meeting items be numbered?

Use Meeting #.Sequence — item 3.02 is the second item raised in meeting #3. When an item carries forward to the next meeting it keeps its original number until it closes, so everyone can see how long it has been open. This template numbers new business automatically from the meeting number.

What is the difference between old business and new business?

Old business is every item still open from previous meetings, carried forward with its original number and an updated status. New business is anything raised for the first time at this meeting. Action items are the specific tasks that come out of both — one owner, one due date.

How does the Open Action Items tab work?

It reads the action item tables on the OAC, sub coordination, and foreman tabs and lists every item not marked Closed, with owner, due date, days open, and an overdue flag. It also counts open and overdue items per meeting. You never type on it — it updates as you close items on the meeting tabs.

Who should get the meeting minutes?

Every attendee plus anyone who was invited but absent. Send them within 24–48 hours. Many contracts and GCs ask attendees to submit written corrections within a set number of days, otherwise the minutes stand as recorded — check your own contract for any notice requirements.

Number it, carry it, close it

Construction meeting minutes are the project record of what was decided, who owns each open item, and when it is due. Done right, they shorten every meeting that follows — old business goes fast because everyone can see exactly what is still open and for how long.

This free template covers the three meetings that run most jobs — the OAC progress meeting, the weekly subcontractor coordination meeting, and the foreman meeting — with consistent item numbering and a roll-up of every open action item. Pair it with the three-week look-ahead for the coordination meeting.

When action items start pointing at RFIs, submittals, and change orders kept in other files, Field PM keeps those records and the project team in one place.

Construction meeting minutes that actually close items

Most job meetings don't fail because nobody talked. They fail because nobody wrote down who agreed to do what, by when — and next week the same five items come up again with no one sure whether they were ever assigned. Good construction meeting minutes fix that. They number every item, carry it forward until it closes, give every action one owner and a date, and make it obvious which items have been sitting open for a month. The free template above does that for the three meetings that run most jobs: the OAC meeting, the subcontractor coordination meeting, and the foreman meeting.

The three meetings on a construction project

OAC (Owner-Architect-Contractor) meeting

The OAC meeting is the formal progress meeting between the owner, the design team, and the GC. It is where decisions get made and recorded: RFI answers, submittal status, change order approvals, schedule recovery, pay application questions. Because the minutes become part of the project record, they matter when there's a dispute about who knew what and when. A typical agenda:

  1. Safety — incidents, recordables, site-wide issues
  2. Schedule — look-ahead, critical path, weather days, recovery plans
  3. RFIs — open, overdue, answers that change scope
  4. Submittals — status, resubmittals holding long-lead equipment
  5. Change orders and pending changes — pricing, approvals, directives
  6. Quality — inspections, deficiencies, testing results
  7. Pay application — draft review, stored materials, retainage
  8. Owner items — furniture, IT, security, move-in dates
  9. Old business, new business, action items, next meeting

Subcontractor coordination meeting

The weekly sub meeting is run by the superintendent with every trade foreman or PM. It is less about decisions and more about sequence: who needs which area when, which MEP clashes need to be solved before the lid goes on, which inspections are scheduled, and which deliveries and crane picks are coming. Walk the three-week look-ahead area by area and record every hand-off as an action item with a date.

Foreman meeting

The foreman meeting is internal to a contractor — the general foreman or superintendent and the crew foremen. It covers the safety topic of the week, incidents and near misses, manpower and equipment needs, material shortages, and production problems. The template's foreman tab adds a Safety & Crew block for those, and anything that affects another trade gets pushed up to the sub coordination meeting.

How the item numbering works

Numbering is what makes minutes useful. This template uses the most common convention in commercial construction: Meeting #.Sequence.

  • Item 3.02 is the second item raised in meeting #3.
  • When 3.02 is still open at meeting #7, it appears under Old Business as 3.02 — not renumbered. Anyone reading the minutes can see it has been open for four meetings.
  • New business in meeting #7 is numbered 7.01, 7.02, 7.03… automatically from the Meeting # cell.
  • Numbers are never reused. A closed item stays closed in the record.

Some GCs use a topic prefix instead (S-01 for schedule, R-03 for RFIs). That works too — the important part is that an item keeps the same number from the day it's raised until the day it closes.

Writing action items that get done

An action item has four parts: what, who, by when, and status. "Electrical to look into the switchgear" fails all four. "Mike Alvarez (Brightline) to resubmit switchgear submittal addressing metering comments by 9/22" passes.

  • One owner, a person. "Mechanical" is not an owner. The foreman or PM who will actually do it is.
  • A real date. "ASAP" and "next week" are not dates. If the owner can't commit to a date in the meeting, the action item is to come back with one.
  • Close it in the meeting. Items get marked Closed when the room agrees they're done, so the record shows who accepted it.

Days open and the roll-up

Every item table in the workbook calculates Days Open — today minus the opened date — and blanks it once the item is Closed. Items open 14+ days turn amber, 30+ turn red, and any open item past its due date is flagged. The Open Action Items tab pulls every unclosed action from all three meetings into one list with owner, due date, days open, and an OVERDUE flag, plus a summary of open and overdue counts per meeting. Print it and hand it out at the start of the next meeting — it's the fastest way to get through old business.

Common meeting-minutes mistakes

  1. Transcripts instead of minutes. Record decisions and actions, not who said what. One or two lines per item.
  2. Publishing late. Minutes sent a week later get skimmed and disputed. Send them within a day or two.
  3. Letting items fall off. If an item disappears between meetings without being closed, you've lost the record. Carry everything forward until it closes.
  4. Burying scope and cost changes. If the owner asks for added work in a meeting, the minutes should say "proceed to pricing" or "directed to proceed" — then write the change order. Meeting minutes don't replace the notice and change-order process in your contract. This template isn't legal advice.
  5. No distribution list. Absent invitees need the minutes most.

When to move beyond a spreadsheet

Excel minutes work well for one project and one person keeping the file. They get harder when action items reference RFIs, submittals, and change orders that live somewhere else, or when three supers are each keeping their own copy. Field PM's PM dashboard keeps RFIs and change orders, daily reports, and the project team in one place, so the items discussed in the meeting are tied to the records they came from. Start a free 30-day trial — no credit card required.

Related construction templates

Rated by contractors on

Field PM reviews on CapterraField PM reviews on GetAppField PM reviews on Software Advice