A milestone timeline that counts back from your grand opening date, and a checklist by workstream from lease to opening day.
We'll email you a copy + send the file to your browser right now.
By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.
Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.
01
Milestones with workstream, days before opening, calculated target date, owner, status, actual date and days to go.
02
Real estate and permits, construction, IT, fixtures, utilities, inspections and CO, hiring and training, merchandising, grand opening.
03
How to set your own lead times, keep one owner per milestone, and protect the construction turnover date.
Want this automated?
Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.
30 days free · no credit card · every feature unlocked from day one.
Paper / Excel
Field PM
On your phone & tablet
This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:
The platform behind the templates
You type the grand opening date once. Each milestone has a "days before opening" number, and its target date is the opening date minus those days. Change the opening date and every target date moves with it. A days-to-go column counts down and goes negative when a milestone is past due.
No. They are placeholders to show how the sheet works. Permit, utility and equipment lead times vary a lot by market and by the authorities involved, so replace them with the lead times your own program has seen.
Real estate and permits, construction, IT and telecom, fixtures and equipment, utilities, inspections and the certificate of occupancy, hiring and training handoff, merchandising handoff, and the grand opening itself.
Store development, construction and operations teams at retail chains, restaurant groups, banks and clinics, plus the general contractors and program managers who work for them.
Construction turnover is usually the date everything else stacks behind: fixtures, merchandise, hiring and training. The checklist tracks it as its own workstream and links to a separate store turnover checklist for the handover itself.
A new store has one date that cannot move without cost: the grand opening. Everything else, from the permit to the last training shift, has to land in front of it. The simplest way to plan that is to count backward, which is exactly what the timeline tab does.
The checklist tab then covers the work that falls between teams: the landlord approval nobody chased, the internet circuit ordered too late, the certificate of occupancy that holds up merchandise. Mark each item Done, Open or N/A and the sheet shows where each workstream stands.
Opening several stores at once? Keep them all on the free multi-site project tracker, and use the store turnover checklist when construction hands the building to operations. For the contractor side of closeout, see the project closeout checklist.
Contractors who use Field PM can share daily reports, photos, schedule and progress by phase code with you live from their own accounts. Learn more on the multi-site retail owners page.