Free handover checklist · Excel
Hand a finished store from construction to store operations with nothing left behind: approvals, punch, documents, keys and codes, attic stock, systems training, cleaning and signed acceptance.
We'll email you a copy + send the file to your browser right now.
By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.
Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.
01
Approvals and inspections, punch status, documents, keys and codes, attic stock, systems training, cleaning and acceptance, with % complete.
02
Every document owed at turnover: system, provided by, format, date received, received by, status and where it is stored.
03
Keys, fobs, badges and code changes counted from contractor to store, with a two-party sign-off. Instructions tab included.
Want this automated?
Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.
30 days free · no credit card · every feature unlocked from day one.
Paper / Excel
Field PM
On your phone & tablet
This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:
The platform behind the templates
Turnover is the point where construction hands a finished store, or a remodeled area, to the people who will run it. The store gets the building, the documents, the keys and the training; the contractor keeps responsibility for open punch items and warranties.
Typically the certificate of occupancy and final inspections, O&M manuals, warranties with start dates, as-built or record drawings, approved submittals, panel schedules, fire alarm and sprinkler test reports, and a contact list for warranty service. The Handover Documents tab lists these as a starting point.
No. The Keys & Access tab records that codes were changed and handed over, and to whom, but never the codes themselves. Keep codes with the monitoring company and store operations.
At minimum HVAC and thermostats, lighting controls and emergency lighting, the fire alarm panel, security and access control, plumbing shut-offs and the electrical main. Add refrigeration and food equipment if the store has them, and record who attended the training.
The checklist states that it does not, but your contract decides. Substantial completion, final completion and retainage release follow the contract terms. This checklist is a practical guide, not legal advice.
Turnover is the last day the contractor's whole team is in the building. Anything the store does not collect then, such as manuals, warranty start dates, the last key or the training on the lighting controls, gets much harder to chase later. A turnover checklist makes the handover a meeting with an agenda instead of a hand-off at the door.
This store turnover checklist covers what owners and store operations usually need: approvals, punch, documents, keys and codes, attic stock, systems training and a clean store. The document register and keys log give you a record of what arrived and who received it.
Track the remaining punch with the free A/B/C punch list or the standard punch list template, and use the project closeout checklist for the contractor side of closeout.
Contractors who use Field PM can share daily reports, photos, QA/QC inspections, change orders and invoices with the owner live from their own accounts, item by item. See the multi-site construction program software page for how owners use it.