Free punch list · Excel
A punch register with category A, B and C priorities for mechanical completion, turnover and final acceptance, with verification, overdue flags and a summary that tells you whether the A items are clear.
We'll email you a copy + send the file to your browser right now.
By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.
Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.
01
150 rows: item, category, description, location, system or tag, discipline, responsible, raised by, dates, status, verified by, days open and overdue.
02
Category by status counts, overdue items, % closed with progress bars, the open A and B items check, and open items by discipline.
03
How to use the statuses, common A/B/C definitions and how to agree them per contract, and walkdown good practice.
Share this live with your client
Punch priorities tell the owner what has to close before turnover and what can wait. Open category A items are what hold up acceptance.
In Field PM, your QA/QC inspections and photos can be shared live with your client, item by item, from your own account.
Want this automated?
Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.
30 days free · no credit card · every feature unlocked from day one.
Paper / Excel
Field PM
On your phone & tablet
This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:
The platform behind the templates
In common use, Category A items must be closed before the system or area moves to the next stage, such as mechanical completion, energization or turnover. Category B items must be closed before final acceptance or handover. Category C items are minor or cosmetic and can be finished after handover by agreement. These are common definitions, not a standard, so agree them in the contract or turnover procedure.
Industrial, energy and EPC projects use it most, for system turnover and mechanical completion. Owners running commercial and retail programs use the same idea to separate what blocks opening from what can wait.
It counts Category A items that are Open or Ready to Verify. If that count is zero, it says the A items are clear; otherwise it shows how many are still open. It does not replace your turnover procedure, which may have other conditions.
Because the person who did the work should not close their own item. The responsible party marks it Ready to Verify, and the inspector or owner representative checks it and marks it Closed.
The standard punch list template is built for building trades and room-by-room walks. This one adds category priorities, system or tag numbers, disciplines, verification, days open and a category by status summary, which suits system-based turnover.
A long punch list is not the problem. The problem is not knowing which items stop the next step. Category A, B and C priorities answer that: A blocks the next stage, B blocks final acceptance, and C can wait until after handover by agreement. With every item categorized, the turnover meeting is about a short list instead of the whole register.
This template keeps one row per item with the system or tag, discipline, responsible party and dates, and adds a verification step so items are closed by the person accepting them. The summary counts items by category and status and checks for open A items.
For room-by-room building punch, use the standard punch list template. For handing a finished store to operations, see the store turnover checklist and the project closeout checklist.
In Field PM, contractors log QA/QC inspections and photos from the field and can share them with their client live from their own accounts, item by item. Owners and GCs who manage many contractors can read more on the subcontractor management software page.