Free program tracker · Excel
Every store or site in your construction program on one sheet: status, turnover dates, days late, % complete, budget vs. committed vs. actual, and open items, with a portfolio roll-up.
We'll email you a copy + send the file to your browser right now.
By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.
Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.
01
Store #, city, region, type, contractor, status, start, planned and forecast turnover, days late, opening date, % complete bar, budget, committed, actual, open items and next step.
02
Sites in program, total budget and cost, late sites, over-budget sites and open items, plus tables by status, region and project type. All formulas.
03
How to set it up for your program, how to run the weekly program call from it, and where the numbers should come from.
Want this automated?
Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.
30 days free · no credit card · every feature unlocked from day one.
Paper / Excel
Field PM
On your phone & tablet
This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:
The platform behind the templates
It is one list of every project in a program, such as a chain of store remodels or new openings, with the status, key dates, cost and open items for each site. It lets a program manager see which sites are late, over budget or stuck without opening every project file.
Owners and facilities teams running store programs (retail, restaurants, banks, clinics), the program managers who report on them, and general contractors who run several sites for the same client and need one status sheet.
It counts sites and adds budget, committed and actual cost by status, by region and by project type. It also shows average % complete, sites running late, sites where committed cost is over budget, and total open items. It is all formulas, so there is nothing to type.
It is the actual or current forecast turnover date minus the planned turnover date. A positive number means the site is running late. Set the planned date once at award and update the forecast every week.
Yes. Edit the dropdown lists with Data > Data Validation, and change the matching labels on the Portfolio Summary tab so the counts still line up.
Percent complete should come from the contractor's reported progress, not from how much money has been spent. Committed is the contract plus approved change orders; actual cost comes from approved invoices.
When a retail chain or other multi-site owner runs dozens of remodels or new stores a year, the hard part is not any single project. It is knowing, every week, which sites are on track, which are slipping, and where the money is going. Most programs start with a spreadsheet like this one: one row per site, a status, the key dates and the cost picture.
This multi-site project tracker gives you that sheet with the math done. Days late compares forecast turnover with the plan. Committed over budget shows buyout and approved changes that already exceed the site budget. The Portfolio Summary counts sites and adds dollars by status, region and project type, so the program review starts with the exceptions.
A tracker is only as current as the updates behind it. Contractors who use Field PM can share daily reports, photos, schedule, progress by phase code, change orders and invoices with you live from their own accounts, item by item. See how that works for owners on the multi-site construction program software page and the multi-site retail owners page.
Running the stores themselves? Pair this tracker with the free store remodel checklist, new store opening checklist and store turnover checklist.