Free retail checklist · Excel
A phase-by-phase checklist for remodeling a store that stays open, from approvals to turnover, plus a night work and area closure log the store manager signs.
We'll email you a copy + send the file to your browser right now.
By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.
Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.
01
Approvals, operating-store coordination, demo, MEP, finishes, fixtures, signage and IT, inspections, punch and turnover. % complete per phase.
02
One row per shift: area, work done, customer closure, store contact notified, fire or alarm impairment, and the handback check before opening.
03
How to set the checklist up as your program standard, and what owners worry about most when a store stays open.
Want this automated?
Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.
30 days free · no credit card · every feature unlocked from day one.
Paper / Excel
Field PM
On your phone & tablet
This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:
The platform behind the templates
This one covers eight phases: pre-construction and approvals, coordination with the operating store, demolition, mechanical, electrical and plumbing, finishes, fixtures, signage and IT, inspections, and punch and turnover. Each item is marked Done, Open or N/A, and the sheet shows % complete.
Yes. A full section covers phasing, after-hours work windows, contractor access and alarms, customer paths and exits, dust and merchandise protection, fire system impairments and the daily handback before the store opens. A separate log records each night shift and area closure.
Usually the owner's project manager or the general contractor's superintendent, with the store manager signing the night work log and the turnover. Many owners send the checklist to every contractor so each store is checked the same way.
Yes. The file is a normal .xlsx with no protected cells. Add, delete or reword items before you send it out, and the % complete formulas adjust to the rows that are there.
No. It is a coordination tool. Code inspections, fire system rules and your contract terms still govern. Use the checklist to make sure nothing gets missed.
Most retail remodels happen while the store keeps selling. That changes what matters. Construction quality still counts, but the owner's bigger risks are customers near the work, blocked exits, dust on merchandise, alarms left off overnight and a sales floor that is not ready at opening time.
This store remodel checklist puts those risks next to the normal construction steps. The operating-store section covers phasing, work windows, access and alarms, customer paths, protection and fire system impairments. The night work log gives the store manager a simple record of every closure and handback.
Running remodels across many stores? Track them all on the free multi-site project tracker, finish each one with the store turnover checklist and the punch list template.
Contractors who use Field PM can share daily reports, photos, schedule and change orders with the owner live from their own accounts, item by item. See how that works for owners on the multi-site construction program software page.