Free confined space permit · Excel

Free Confined Space Entry Permit Template

Permit-required confined space entry permit built on OSHA 29 CFR 1926.1206 — every required item, an atmospheric log that grades O₂ / LEL / CO / H₂S readings PASS or FAIL, and an entry roster for the attendant.

  • Every item required by 29 CFR 1926.1206 (a) through (p)
  • Entrants, attendants, entry supervisor, and tester
  • Hazard, isolation / LOTO, and equipment checklists
  • Editable acceptable entry conditions — O₂, LEL, CO, H₂S, other
  • Pre-entry tests graded PASS / FAIL with DO NOT ENTER status
  • Atmospheric Log + Entry Roster ("people inside now")
  • Rescue, communication, authorization, and cancellation

Confined Space Entry Permit

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

Entry Permit

Space, purpose, duration, people, hazards, isolation, acceptable entry conditions, pre-entry tests, rescue, communication, equipment, other permits, authorization, and cancellation.

02

Atmospheric Log

Periodic or continuous readings with time, location, tester, and meter ID — each graded against the permit limits, with lowest O₂ and highest LEL / CO / H₂S.

03

Entry Roster

Every entry and exit with time in space and a live count of people inside for the attendant.

04

Instructions

Step-by-step use with the OSHA Subpart AA references.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What must a confined space entry permit include under OSHA construction rules?

Under 29 CFR 1926.1206 the permit must identify the space; the purpose of entry; the date and authorized duration; the authorized entrants (by name or through a roster or tracking system); the means of detecting an increase in atmospheric hazards if ventilation stops; each attendant and the entry supervisor by name, with the supervisor's signature or initials; the hazards; the isolation and control measures; the acceptable entry conditions; test results with tester names or initials and times; rescue and emergency services and how to summon them; communication procedures; equipment; any other necessary information; and any additional permits such as hot work. The template has a section for each.

What are acceptable atmospheric levels for confined space entry?

OSHA defines a hazardous atmosphere (1926.1202) as including oxygen below 19.5% or above 23.5%, flammable gas above 10% of its lower flammable limit, and any substance above its permissible exposure limit. For construction, the PELs in 1926.55 Appendix A include carbon monoxide at 50 ppm and hydrogen sulfide at 10 ppm. Many programs set tighter limits (for example CO at 25 ppm or H₂S at 1 ppm). The template makes these editable and grades every reading against them.

In what order do you test the atmosphere?

Oxygen first, then combustible gases and vapors, then toxic gases and vapors — 29 CFR 1926.1204(e)(3). Oxygen comes first because many combustible sensors need normal oxygen to read correctly. Test the top, middle, and bottom of vertical spaces because gases stratify.

How long do you keep a cancelled confined space permit?

At least one year (1926.1205(f)), and you use them in the annual review of your permit-space program. Note any problems encountered on the permit so the program can be corrected.

Can the attendant go in to rescue an entrant?

No. The attendant stays outside, keeps count of who is inside, monitors conditions, orders evacuation, and summons rescue. Non-entry rescue with a harness, retrieval line, and mechanical device (required for vertical spaces over 5 ft deep, 1926.1211) lets the attendant retrieve someone without entering.

Identify, isolate, test, authorize, monitor, cancel

A confined space entry permit is the written record that a permit-required space has been evaluated, its hazards controlled, its atmosphere tested, and a rescue plan put in place — signed by the entry supervisor and posted at the portal before anyone goes in.

This free Excel template follows OSHA 29 CFR 1926.1206 line for line and adds an atmospheric log that grades every reading against your acceptable entry conditions, plus an entry roster so the attendant always knows who is inside. Welding inside the space? Add a hot work permit.

Field PM keeps permits, JSAs, and inspections on your crew's phones and files them to the project, so the cancelled permits are there for the annual program review.

Confined space entry permits on construction sites

Most confined space fatalities follow the same pattern: someone goes into a manhole, vault, tank, or pit that "was fine yesterday," the atmosphere has changed, they go down, and a coworker goes in after them. OSHA's construction standard for confined spaces — 29 CFR 1926 Subpart AA (1926.1200–1926.1213) — is built to break that chain: identify the space, control its hazards, test the air, keep someone outside who knows who is inside, and have a rescue plan that doesn't depend on a coworker's instincts.

The entry permit is where all of that gets written down and signed before anyone goes in. The free template above follows 1926.1206 item by item, then adds two working tabs: an Atmospheric Log that grades every reading PASS / FAIL against the limits on the permit, and an Entry Roster so the attendant always knows how many people are inside.

Is it a permit-required confined space?

A confined space is large enough to bodily enter, has limited or restricted means of entry or exit, and isn't designed for continuous occupancy. It is permit-required when it has one or more of these (1926.1202):

  • Contains or could contain a hazardous atmosphere
  • Contains material that could engulf an entrant
  • Has walls that converge inward or a floor that slopes and tapers to a smaller cross-section that could trap or asphyxiate
  • Contains any other recognized serious safety or health hazard

On construction sites that means electrical and telecom vaults and manholes, sewer and storm structures, wet wells and lift stations, tanks and vessels, crawl spaces and attics with hazards, pits and sumps, boilers, and large ductwork. A competent person has to identify the confined spaces and permit spaces before work starts (1926.1203(a)), and on multi-employer sites the host employer, controlling contractor, and entry employers have to share what they know about the spaces before and after entry (1926.1203(h)).

What goes on the permit (1926.1206)

OSHA itemWhere it goes on the template
(a) Space to be enteredSpace ID, type, location, portal size / depth
(b) Purpose of entryPurpose / work to be done
(c) Date and authorized durationStart and expiry date/time; the sheet calculates hours
(d) Authorized entrantsNames on the permit, or reference the Entry Roster tab
(e) Detecting hazard increase if ventilation stops"If ventilation stops" block
(f) Attendants by namePersonnel block
(g) Entry supervisor by name + signature/initialsPersonnel block and authorization signature
(h) Hazards13-line hazard checklist with Present / Not present and controls
(i) Isolation and control measuresLOTO, blanking, purging, ventilation, portal guarding checklist
(j) Acceptable entry conditionsEditable O₂ / LEL / CO / H₂S / other limits plus other conditions
(k) Test results with tester and timePre-entry test table (PASS/FAIL) + Atmospheric Log tab
(l) Rescue and emergency servicesRescue block — service, phone, how to summon, response confirmed
(m) Communication proceduresCommunication block
(n) Equipment11-line equipment checklist
(o) Other informationOther safety information
(p) Additional permitsHot work, LOTO, energized work permit numbers

Atmospheric testing that actually protects people

Order matters. Test oxygen first, then combustibles, then toxics (1926.1204(e)(3)). A catalytic LEL sensor in an oxygen-deficient space can read low when the space is dangerous.

Test before the cover comes off, then top, middle, and bottom. Crack the lid and sample through the gap if you can. Methane and carbon monoxide tend to rise; hydrogen sulfide and many solvent vapors sink into the bottom of a vault or wet well. A single reading at the opening tells you almost nothing about the bottom.

Bump test the meter daily and calibrate on the manufacturer's schedule. Write the meter ID on the permit so a bad instrument can be traced.

Monitor during entry. Subpart AA requires continuous monitoring of atmospheric hazards unless you can show continuous equipment isn't commercially available or periodic monitoring is enough (1926.1204(e)(2)). In practice every entrant wears a four-gas monitor with alarms, and the attendant logs readings at a set interval.

The template's acceptable-limits block starts from the OSHA definitions — O₂ 19.5–23.5%, LEL at or under 10% — and editable program limits for CO (25 ppm default) and H₂S (10 ppm default, the OSHA construction PEL). Set them to your written program. The pre-entry test table and the Atmospheric Log both grade readings against those cells, so changing a limit once updates everything.

The example in the Atmospheric Log

The log comes with a realistic example from a utility vault: clean readings at pre-entry, then a CO reading of 38 ppm at 9:00 because the dewatering pump's generator was parked upwind of the blower intake. The row grades FAIL, the entrants exit, the generator moves, the space is purged and retested, and the entry supervisor re-authorizes entry. That is exactly the kind of event the program review is supposed to learn from — and the kind that gets lost when readings live on the back of a glove.

Roles: entrant, attendant, entry supervisor

  • Authorized entrants know the hazards, use the equipment, stay in communication, and get out when told to or when they recognize a warning sign.
  • Attendants stay outside for the whole entry, keep an accurate count of who is inside (the Entry Roster tab does this), monitor inside and outside conditions, order evacuation, summon rescue, and keep unauthorized people away. They never enter to rescue.
  • Entry supervisors verify every entry on the permit before signing, confirm rescue is available, remove unauthorized people, and terminate the entry and cancel the permit when the work is done or conditions change (1926.1210). When responsibility changes hands, the transfer is recorded.

Rescue: plan it before you need it

Write down who will come, how they get called, and whether they can reach this space in time for its hazards. Non-entry rescue comes first when it doesn't add risk: full-body harness, retrieval line attached outside the space, and a mechanical retrieval device for vertical spaces more than 5 ft deep (1926.1211). If you rely on the fire department, confirm they have the equipment and training for confined space rescue and will respond to your site — many don't.

Cancelling the permit

The entry supervisor cancels the permit when the work is done, or suspends or cancels it when a condition not allowed by the permit comes up (1926.1205(e)). Before cancelling, the Entry Roster's "people inside now" count must read zero. Record any problems encountered and keep the cancelled permit for at least a year (1926.1205(f)).

Common confined space permit mistakes

  • One reading at the top of the manhole. Test the full depth, in order, before entry and throughout.
  • Ventilation blowing exhaust into the space. Generators, trucks, and compressors near the blower intake are a classic CO source.
  • Permits that outlive the task. The permit can't run longer than the job it covers (1926.1205(d)).
  • "Rescue: call 911." That isn't a rescue plan unless you've confirmed they can perform a confined space rescue in time.
  • No count of who is inside. After an alarm, the attendant needs to know instantly whether everyone is out.

Beyond the spreadsheet

Permits taped to a manhole barricade get rained on, lost, and forgotten when the annual review comes around. Field PM's safety tools put permits, JSAs, and inspections on the crew's phones and file them to the project, and the form library keeps your permit forms consistent across every crew. Start a free 30-day trial.

Related safety templates

This template is a field aid organized around public OSHA regulations. It does not replace your written permit-space program, a competent person's evaluation, training, or legal advice. State-plan and owner requirements may be stricter.

Rated by contractors on

Field PM reviews on CapterraField PM reviews on GetAppField PM reviews on Software Advice