Free visitor log · Excel

Free Construction Site Visitor Sign-In Log

Know who is on your site at every minute. Name, company, purpose, host, time in/out with hours, safety orientation, PPE, emergency contact and signature — plus a printable daily sign-in sheet.

  • 80-row visitor log with six example visits
  • Time in / time out with automatic hours on site
  • ON SITE status column = emergency visitor headcount
  • Safety orientation Y/N (flags visitors without one)
  • PPE issued, emergency contact and signature columns
  • Printable one-page daily sign-in sheet with site rules
  • Visitor-type dropdown to pull every inspection on the job

Visitor Sign-In Log

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

1

Visitor Log

Running register of every visit with hours on site, ON SITE status, orientation and PPE — plus a summary of headcount, visitor hours and inspector visits.

2

Daily Sign-In Sheet

Printable landscape clipboard sheet: project header, muster point, site rules for visitors, 18 sign-in lines with signature column.

3

Instructions

Who signs in, the five-minute visitor orientation, using the log for emergency accountability, and privacy.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

Who needs to sign in on a construction site visitor log?

Everyone who is not covered by a crew's own daily sign-in or badge system: owners and owner reps, architects and engineers, inspectors, testing technicians, vendor reps, delivery drivers who leave the cab, utility crews, insurance and safety auditors, and tour groups.

Is a visitor log required by OSHA?

OSHA does not prescribe a visitor log form, but employers must have an emergency action plan that can account for people on site after an evacuation (29 CFR 1926.35), and many owners, GCs and insurers require one. A visitor log with time in and time out is the simplest way to know who else is on site.

What should a visitor safety orientation cover?

Site hazards and restricted areas, required PPE, escort rules, what to do when the alarm sounds and where the muster point is, how to report an injury or unsafe condition, and site rules such as no operating equipment. Keep it short — five minutes — and log that it happened.

How does the template calculate hours on site?

Hours on Site = (Time Out − Time In) × 24, rounded to two decimals, using MOD so a visit that runs past midnight still calculates correctly. Anyone signed in but not signed out shows as ON SITE, which is your visitor headcount in an emergency.

How long should I keep visitor logs?

Keep them with the project records for at least as long as your contract, insurer and company retention policy require — many contractors keep them through the warranty period or longer, since they help settle disputes about inspections and site visits.

Every visitor accounted for

A construction site visitor log records everyone on the job who isn't on a crew's own sign-in: owners, architects, engineers, inspectors, testing techs, vendors and delivery drivers. It tells you who is on site right now, whether they got a safety orientation and PPE, and who is responsible for them.

This free Excel template calculates hours on site from time in and time out, flags anyone still ON SITE for emergency headcount, and highlights visitors without an orientation. The printable daily sheet puts your site rules at the top and a signature column on every line.

Pair it with our toolbox talk log and safety inspection checklist to round out your site safety records.

Why every jobsite needs a visitor log

Your crews are accounted for: they're on the daily report, the timesheet, the badge system. The people who aren't are the owner's rep who wandered up to Level 3, the inspector who showed up early, the vendor rep looking for the foreman, and the delivery driver who walked into the building to find someone to sign. When the fire alarm goes off or someone gets hurt, those are the people nobody can account for. A construction site visitor log fixes that, and it creates a dated record of every inspection, engineer visit and owner walk on the job.

The free Excel template above has two parts: a Visitor Log tab that calculates hours on site and flags anyone still ON SITE, and a printable Daily Sign-In Sheet for the clipboard at the gate, with site rules at the top and a signature column.

What's in the template

ColumnWhy it's there
Date / Visitor Name / CompanyWho was here, and who they work for.
Visitor TypeDropdown: owner rep, architect/engineer, inspector/AHJ, vendor/delivery, utility, testing, non-badged sub, insurance/safety, other. Filter by type to pull every inspection on the job.
Purpose of Visit"Above-ceiling inspection L1" is the kind of line that settles a dispute later.
Host / EscortThe person responsible for the visitor while they're on site.
Time In / Time Out / Hours on SiteHours calculate automatically, including visits that cross midnight.
Safety Orientation (Y/N)Red when N. No orientation means escorted at all times, out of active work areas.
StatusON SITE (signed in, not out), Signed out, or Not signed in. Filter ON SITE for an emergency headcount.
PPE Issued / VerifiedWhat you handed out (or confirmed they brought): hard hat, glasses, vest, boots, hearing protection.
Emergency ContactName and phone, so you're not searching if a visitor is hurt.
SignatureOn the printed sheet: the visitor's acknowledgment of the site rules.

The summary block counts visits logged, the current ON SITE headcount, visits without a safety orientation, total visitor hours, inspector visits, and the most recent visit date.

The five-minute visitor orientation

A visitor orientation doesn't have to be the full new-hire safety orientation. It has to cover what can hurt them on your site today and what to do if something goes wrong. A good one fits on the top of the sign-in sheet — the template's printable sheet has it built in:

  • Check in and stay with your host. Escorted at all times unless the superintendent says otherwise.
  • Minimum PPE: hard hat, safety glasses, high-visibility vest, safety-toe boots — plus whatever is posted for the area (hearing protection, gloves, fall protection).
  • Stay out of barricaded areas, crane swing and suspended-load zones, open excavations and energized equipment. Don't operate tools or equipment.
  • If the alarm sounds: stop, leave by the nearest exit, go to the muster point, and don't leave the site until your host has accounted for you.
  • Report any injury, near miss or unsafe condition to your host immediately.

Hazard-specific items belong in the orientation when they apply — silica work, overhead steel erection, confined spaces, energized electrical work, active traffic control. If a visitor is going into a hazardous area for an inspection, the host should walk them through that area's JSA. Our JSA template works for that.

The visitor log is your emergency headcount

An emergency action plan (OSHA 29 CFR 1926.35) has to include procedures to account for everyone after an evacuation. Crews are counted by their foremen at the muster point. Visitors are counted from the visitor log: everyone showing ON SITE who isn't at the muster point is someone you have to find. That only works if people sign out, so make the sign-out as important as the sign-in. Put the clipboard where people leave, not just where they arrive, and have the gate or trailer admin check the ON SITE list before locking up.

Inspectors, engineers and owner reps: why the record matters

On most jobs the visitor log is the only independent record that an inspector, engineer or owner's rep was physically on site on a given day. That comes up more often than you'd think:

  • An inspection result is disputed, or an inspector says an area was never presented.
  • The engineer "never saw" a condition that was pointed out on a site walk.
  • An owner's rep directed work in the field that later turns into a change-order argument.
  • Material goes missing, and the police or your insurer ask who was on site.

Record the purpose of each visit in plain words. "Above-ceiling inspection, Level 1, passed" or "Structural engineer reviewed embed conflict at B/2" is the line you'll want to find later.

Paper at the gate, spreadsheet in the trailer

Most sites work best with both. Print the Daily Sign-In Sheet (one landscape page, 18 lines, site rules and a signature column) and keep it on a clipboard at the gate or trailer door. At the end of the day, the superintendent or site admin copies the entries into the Visitor Log tab, where they're searchable and the hours and headcount calculate. Scan the signed paper sheet and file it with the day's daily report.

Privacy

Emergency contacts, phone numbers and signatures are personal information. Keep the clipboard where the public can't read it, file completed sheets, and share the log only with people who need it for safety, security or project records.

Related safety templates

Beyond the clipboard

Field PM keeps crews, safety forms, toolbox talks and daily reports on the phone in one place, so the super isn't retyping clipboards at 6 PM and the project history is searchable from the office. Start a free 30-day trial — no credit card required.

Rated by contractors on

Field PM reviews on CapterraField PM reviews on GetAppField PM reviews on Software Advice