Free I&E QC template · Excel

Free Wire List, Tubing Test & Haz Area Inspection

Three I&E QC records in one workbook: conductor-by-conductor termination status, instrument tubing pressure tests with pass/fail, and hazardous area equipment inspections with deficiency tracking.

  • Wire list: cable, core, from / to terminal, wire tag, ferrule
  • Terminated-by / checked-by status + % checked roll-up
  • Duplicate-terminal flag
  • Tubing test: spec test pressure, hold time, start / end, drop
  • Automatic PASS / FAIL + first-time pass rate
  • Haz area: area class, marking, protection method, glands & seals
  • Visual / close / detailed grades + open-deficiency count

Wire List & Tubing Test

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

Wire List

One row per conductor with from/to terminals, wire tag and ferrule. Status moves OPEN → CHECK PENDING → CLOSED or REWORK, with a % checked roll-up.

02

Tubing Pressure Test

Tubing runs by test package with material, size, medium, spec test pressure and hold time, start/end pressure and a PASS / FAIL formula.

03

Hazardous Area Inspection

Equipment tag, area classification, nameplate marking, protection method, gland/seal and enclosure checks, inspection grade, result and corrective action.

04

Instructions

What to check on each record, how the formulas decide, and the three inspection grades explained.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What is a wire list (termination list)?

A wire list is a conductor-by-conductor record of where each wire in a cable lands: cable tag, pair or core, color, from device and terminal, to junction box or panel and terminal, wire tag and ferrule. On a construction job it doubles as the termination QC record — who landed each wire and who checked it.

How does the tubing pressure test pass/fail work?

You enter the test pressure and hold time required by your project specification, the actual hold time, the start and end pressure, and the allowable drop. The sheet calculates the drop and marks PASS only when the start pressure is at or above the test pressure, the hold time was met, and the drop is within the allowable. The template never chooses the test pressure for you.

What are visual, close and detailed inspections?

They are three depths of hazardous area inspection. Visual is look-only with no tools. Close adds access equipment and a hands-on check of the outside — glands, seals, fasteners, bonding and marking — with the enclosure still shut. Detailed means opening the equipment with the circuit isolated and the area proven gas-free, to check flamepaths, terminations and internal parts.

Does the hazardous area tab tell me if equipment is compliant?

No. It records what the inspector found — area classification from the drawing, nameplate marking, protection method, gland and seal condition — and flags an item DEFICIENT if the inspector marks the marking unsuitable or a check failed. Compliance is decided against the NEC (Articles 500–506), the area classification drawing and your client standards; verify against the edition adopted by your AHJ.

Can I use the wire list for power and control cables too?

Yes. The layout works for any multi-conductor cable — instrument pairs, control cable, and power feeders to motors and heaters. Add one row per conductor, including grounds, shields and spares.

Build the QC record while the work gets done

Termination checks, tubing pressure tests and hazardous area inspections are the I&E records most often rebuilt from memory at turnover. This free Excel workbook keeps all three in one file, with status and pass/fail calculated so the record is consistent from crew to crew.

Use it between the instrument index & I/O list and the loop check sheet: a loop is ready for loop check when its wires are CLOSED and its tubing has PASSED.

Field PM moves QC checks, photos, hold points and sign-offs into one app your crews use in the field, and files each signed record into the job book.

The three I&E QC records that get skipped until turnover

On most industrial and oil & gas jobs, the wire list, the tubing test records and the hazardous area inspection are the paperwork everybody means to keep up and nobody does — until the client's turnover package reviewer asks for them. Then someone spends a week reconstructing termination checks from memory and re-testing tubing that was already covered in insulation. The free workbook above puts all three on tabs in one file, with status and pass/fail done by formula, so the record gets built while the work gets done.

Tab 1: Cable termination / wire list

Build it from the cable schedule and termination drawings before the wire is pulled: one row per conductor, including shields, drains, grounds and spares. Each row carries the cable tag, pair or core, color, the from device and terminal, the to junction box or panel and terminal, the wire tag, and the ferrule.

How the status works

  • OPEN — not landed yet.
  • CHECK PENDING — the installer has initialed Terminated By.
  • CLOSED — a second person checked it and marked Yes.
  • REWORK — the checker found a problem. Write it in Remarks.

The roll-up counts conductors listed, terminated, checked and in rework, and shows % checked — a real progress number for terminations, which are otherwise hard to measure. If two conductors are landed on the same terminal of the same box, the To Terminal cell turns red so someone confirms it's intentional.

What a termination check should actually cover

  • Right conductor on the right terminal per the drawing.
  • Wire tags readable and matching at both ends.
  • Ferrule sized for the conductor, fully crimped, no strands outside it, no insulation under the clamp.
  • Tug test on every conductor.
  • Shields and drains landed only where the drawing shows — usually the panel end only.
  • Spare cores terminated or insulated as the spec requires, and labeled.

Tab 2: Instrument tubing pressure test record

Impulse lines and instrument air tubing get pressure-tested before insulation and before the loop check. Group runs into test packages and record one row per run: from/to, tag, material, OD and wall, test medium, test pressure, required hold time, actual hold time, start and end pressure, and allowable drop.

The test pressure and hold time come from your project's piping or tubing specification, or from the engineer. The template doesn't pick them, and you shouldn't either. The sheet calculates the pressure drop and marks the row:

  • PASS — start pressure at or above the test pressure, hold time met, and drop no more than the allowable (blank allowable means zero drop).
  • FAIL — anything else. Find the leak, re-make the fitting, and log the retest as a new row so the history stays in the record.

Safety: a pneumatic test stores far more energy than a hydrotest at the same pressure. Follow the site pressure-test procedure, barricade the area, use a relief device and a calibrated gauge, isolate any transmitter or gauge rated below the test pressure, and never exceed the specified pressure. For fitting and thread references see our NPT thread chart and pipe schedule chart.

Tab 3: Hazardous area equipment inspection

Every piece of electrical and instrument equipment in a classified location has to be suitable for that location — and has to stay that way through construction, when covers get left loose, glands get cross-threaded and seal fittings don't get poured. The inspection tab records, per item:

ColumnWhat to record
Area classificationFrom the approved area classification drawing — Class/Division or Zone. Not from the nameplate.
Gas group / T-code requiredWhat that location requires.
Nameplate markingExactly what the equipment is marked, as found.
Protection methodExplosionproof / flameproof, intrinsic safety, increased safety, purged / pressurized, nonincendive, encapsulated, hermetically sealed.
Marking suits area?The inspector's call, Yes or No.
Gland / seal fittingType, tightness, seal poured and tagged, correct gland for the cable.
Enclosure conditionCovers, fasteners, gaskets, damage, corrosion, blanking plugs.
Inspection gradeVisual, Close or Detailed.

The Result formula marks an item DEFICIENT when the marking doesn't suit the area, a gland or seal failed, or the enclosure failed; ACCEPTABLE when the marking suits and the enclosure passed. Each deficiency gets a corrective action and an Open/Closed status, and the summary counts what's still open.

Visual, close and detailed — what each one means

  • Visual — look only, from the ground or a platform, nothing opened and no tools. Catches missing bolts, broken glass, damaged cable, missing plugs, corrosion.
  • Close — everything in visual, up close with a ladder or lift and hands on the outside: glands, seal fittings, bonding, gaskets, fasteners, and the marking read and compared to the area. The enclosure stays shut.
  • Detailed — everything in close, plus opening the equipment with it isolated and the area proven gas-free under permit: flamepath joints, terminations, internal components, intrinsically safe segregation and barrier wiring.

This follows the visual/close/detailed approach used in IEC 60079-17-style inspection programs, in our own words. The requirements themselves live in NEC Articles 500–506 and your client's standards — verify against the edition adopted by your AHJ. For the classification systems, see our hazardous area classification reference and NEMA enclosure types chart.

How these records fit the rest of the I&E package

Terminations and tubing tests come after the instrument index and I/O list are set and before the loop check. A loop shouldn't go to loop check until its wires show CLOSED and its tubing shows PASS; the hazardous area inspection should be done at install and repeated before energization. Deficiencies from any of the three go on the punch list.

Moving QC records off the clipboard

Field PM QA/QC lets your techs and inspectors fill checks from a phone with photos attached, route hold points for QC and client signatures, and file every signed record into the job book for turnover. The form library includes ready-made industrial QC checklists. Start a free 30-day trial.