Free plumbing template · Excel

Free Plumbing Fixture Schedule Template

The schedule your foreman roughs in from: tag, fixture, manufacturer/model, mounting, CW/HW/waste/vent sizes, flow rate, ADA, trim and carrier — plus a DFU/WSFU worksheet and a water heater schedule.

  • 30-row fixture schedule with connection sizes and flow rates
  • Mounting, ADA and carrier dropdowns + carriers-to-order count
  • DFU / WSFU worksheet linked to the schedule — you enter code values
  • Sizing check: your totals vs. the capacity from your code table
  • Water heater schedule with calculated recovery (gph)
  • Venting, expansion tank, T&P relief and mixing valve columns
  • Live formulas, print-ready landscape layout

Plumbing Fixture Schedule

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

Fixture Schedule

One row per tag: fixture, mfr/model, mounting, CW/HW/waste/vent sizes, flow rate, ADA, trim, carrier, qty and rooms. Totals fixtures, ADA fixtures and carriers to order.

02

DFU & WSFU Worksheet

Pulls tag and qty from the schedule. Enter DFU and WSFU per fixture from your adopted code (IPC 709.1 / Appendix E or UPC) and it totals the load and checks your pipe sizes.

03

Water Heater Schedule

Type, fuel, capacity, input, efficiency, rise, calculated recovery, setpoint, venting, expansion tank, relief valve and mixing valve.

04

Instructions

How to fill each tab, where the code references are, and why the fixture-unit values are yours to enter.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What goes on a plumbing fixture schedule?

One row per fixture tag (WC-1, LAV-1, SK-1…): fixture type and description, manufacturer and model, mounting, the cold water, hot water, waste and vent connection sizes, rated flow (gpm or gpf), whether it is an ADA fixture, trim or flush valve, whether it needs an in-wall carrier, quantity and rooms. It is the sheet the foreman roughs in from, so the sizes should match the approved submittal.

Does the template include the IPC or UPC fixture unit tables?

No — on purpose. Drainage fixture unit (DFU) and water supply fixture unit (WSFU) values differ between the IPC and UPC, change between editions, and are amended locally. You enter each fixture's values from the code your AHJ has adopted (typically IPC Table 709.1 and Appendix E, or UPC Tables 702.1 and 610.3 — verify for your edition), and the worksheet multiplies by quantity and totals them.

How does the DFU / WSFU worksheet work?

Tag, fixture and quantity pull automatically from the fixture schedule. You pick Private, Public or Assembly use, enter the DFU and cold/hot/total WSFU per fixture from your code, and the sheet totals DFU and WSFU. A sizing-check block compares those totals against the capacity you read from your code's sizing table for the pipe size you picked and flags OK or OVER.

How is water heater recovery calculated?

Recovery (gallons per hour) = input in Btu/h (kW × 3,412) × thermal efficiency ÷ (8.33 × temperature rise in °F). It is a sanity check against the manufacturer's rated recovery on the submittal, not a replacement for it.

Is this a substitute for the engineer's design?

No. It organizes the fixture schedule and documents fixture-unit loads for submittals, coordination and field changes. The engineer of record, approved drawings and the code adopted by your AHJ govern pipe sizing.

The sheet your plumbing crew roughs in from

A plumbing fixture schedule lists every fixture on the job by tag, with the manufacturer and model, mounting, connection sizes, flow rate, accessibility and trim. On the drawings it is a reference table; in the field it sets rough-in heights, stub-out sizes, carrier orders and the fixture-unit load that sizes the drain and water service.

This free Excel template gives plumbing contractors a working fixture schedule, a DFU and WSFU worksheet that pulls quantities from it — with fixture-unit values you enter from the code your AHJ has adopted — and a water heater schedule with calculated recovery. Pair it with the plumbing pressure test report to document tests before cover.

When the schedule changes after a substitution or RFI, Field PM keeps the submittal, the RFI and the daily report together so the field is always working from the approved version.

Why the plumbing fixture schedule runs the job

On the drawings, the fixture schedule is a small table in the corner of P-001 or P-601. On the job, it is the most-used sheet a plumbing foreman owns. It sets rough-in heights and carrier orders, tells the crew what size stub-outs to leave, feeds the fixture-unit load that sizes the drain and water service, and becomes the checklist for trim-out and the punch walk. When it's wrong or out of date, you find out at the worst possible time: a 1-1/4" stub where the approved lav needs 1-1/2", a floor-mount water closet roughed at 12" where the approved unit is a wall-hung on a carrier, or an ADA lav roughed at the standard height.

The free template above gives you the field version of that schedule: every column the foreman needs, a fixture-unit worksheet tied to it, and a water heater schedule — in one workbook you control.

What's in the workbook

1. Fixture Schedule

Thirty rows, one per fixture tag, with Tag, Fixture, Description, Manufacturer, Model #, Mounting (dropdown), CW, HW, Waste and Vent connection sizes, Flow Rate with a gpm/gpf/gpc unit, ADA (Y/N), Trim / Faucet / Flush Valve, Carrier (Y/N), Qty, Location and Remarks. The bottom of the sheet totals fixtures, ADA fixtures and — the one purchasing always asks for — the number of carriers to order.

2. DFU & WSFU Worksheet

Tag, fixture and quantity pull straight from the schedule. You enter the drainage fixture units and the cold, hot and total water supply fixture units per fixture from your adopted code, and the sheet extends and totals them. A sizing-check block lets you record the pipe size you picked for the building drain, sewer, largest branch, largest stack, water service and mains, enter the capacity your code allows for that size, and see OK or OVER. A water-demand block records the gpm you read from your code's WSFU-to-demand table, adds continuous loads, and gives you a design flow.

3. Water Heater Schedule

Tag, type, fuel, manufacturer/model, location, storage gallons, input (MBH or kW), thermal efficiency, temperature rise, calculated recovery in gph, setpoint, venting category and size, gas or electrical connection, expansion tank, T&P relief, and mixing valve.

Why the fixture-unit values are yours to enter

Most "fixture unit calculator" spreadsheets you'll find online have a table of DFU and WSFU values baked in. The trouble is, you rarely know which code or edition they came from. The IPC and UPC assign different values to the same fixture, both codes have revised values over the years, and many states and cities amend them. A worksheet with the wrong table in it gives you a confident wrong answer.

This template takes the opposite approach: open the code your authority having jurisdiction has adopted, enter the values for the fixtures on your job, and note the table in the Code Table Ref column. For reference, drainage fixture units are in IPC Table 709.1 (UPC Table 702.1), and water supply fixture units and the demand conversion are in IPC Appendix E and Section 604.3 (UPC Table 610.3 and Chapter 6). Maximum fixture flow rates are in IPC Table 604.4. Section and table numbers move between editions, so verify against the edition adopted by your AHJ. The three italic values on the example rows are placeholders so you can see the math — replace them.

How to fill out the fixture schedule

ColumnWhat to enter
TagThe designation from the drawings (WC-1, UR-1, LAV-1, SK-1, MS-1, EWC-1, FD-1). One row per tag — quantities go in Qty.
Manufacturer / Model #From the approved submittal, not the basis-of-design catalog page. If a substitution was approved, this is where it shows up.
MountingFloor, wall-hung, counter drop-in, undermount, pedestal, recessed. Drives rough-in and blocking.
CW / HW / Waste / VentConnection sizes at the fixture from the cut sheet. These are what the crew roughs to.
Flow Rate + UnitRated gpm for faucets and showers, gpf for water closets and urinals, gpc for metering faucets. Must not exceed your code's maximums or local/green-code limits.
ADAY for accessible fixtures — different rough-in heights, clearances, insulated trap kits, and lever or sensor trim.
TrimFaucet, flush valve, drain, supplies, mixing valve. Where most substitutions and punch items live.
CarrierY if the fixture hangs on an in-wall carrier. Carriers are long-lead and have to be set before framing closes.

Field tips from the rough-in

  • Rough from the approved submittal, never the spec. The spec lists a basis of design; the submittal is what's arriving. Keep the schedule updated when a substitution is approved.
  • Order carriers with the underground. Carrier lead times and wall-thickness conflicts are a classic cause of wet-wall delays. The carrier count at the bottom of the sheet is your purchase order quantity.
  • Mark ADA fixtures on the rough-in layout. A lavatory roughed at standard height in an accessible room is a tear-out, not a punch item.
  • Check the wall. A 4" waste on a wall-hung water closet with a carrier needs a deeper chase than a standard 2x4 wall. Catch it at coordination, not at rough.
  • Track flow rates. Inspectors and green-building reviewers check aerators and flush valves at final. If the delivered trim doesn't match the schedule, it's a punch item.
  • Mixing valves. Public lavatories typically need tempered water limited by a listed device (ASSE 1070 in the IPC). Show the device on the schedule so it gets bought.

Water heater schedule: what the inspector looks at

Beyond capacity and input, water heater inspections focus on venting, relief and expansion. Record the venting category and pipe size (a condensing Category IV heater vents very differently from an atmospheric Category I unit), the T&P valve setting and where its discharge terminates (IPC 504.6 / UPC 608.5 — verify for your edition), whether a thermal expansion tank is required on a closed system, and any mixing valve when storage is set above delivery temperature. The recovery column is a quick check: a 199 MBH condensing heater at 95% efficiency and a 90°F rise recovers roughly 252 gph.

When to move beyond Excel

The fixture schedule lives in three places on most jobs — the drawings, the submittal log, and the foreman's truck — and they drift apart. Field PM keeps submittals, RFIs, inspections, daily reports and job cost together so the approved fixture schedule is on the foreman's phone, and a field change gets captured the day it happens. Start a free 30-day trial — no credit card required.