Free EPC turnover template · Excel
A package index for each system, a tracker for every system on the job, and an acceptance form for the handover. For EPC firms, contractors and owners.
We'll email you a copy + send the file to your browser right now.
By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.
Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.
01
System definition, construction and test records, completion, vendor data and commissioning readiness, with a completeness summary.
02
Every system from MC to acceptance with dates, open comments, days in review and status.
03
Care, custody and control handover with exceptions, warranty start and signatures, plus an Instructions tab.
Want this automated?
Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.
30 days free · no credit card · every feature unlocked from day one.
Paper / Excel
Field PM
On your phone & tablet
This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:
The platform behind the templates
It is the set of records handed to the client for one system when construction is done: the system boundary, test packs, inspection records, mechanical completion certificate, punch list, vendor data and as-builts. When the client accepts it, care, custody and control of the system usually passes to them.
The index lists five sections: system definition, construction and test records, completion records, vendor and engineering data, and commissioning readiness. Mark each document Included, Missing or N/A. Your client's turnover procedure sets the exact list, so edit the index to match.
One row per system with MC date, target turnover, date submitted, comments returned, open comments and date accepted. It counts days in client review and shows a status: Not submitted, Late, In client review, Comments open or Accepted.
Related but not the same. System turnover is usually done system by system on industrial and EPC jobs so commissioning can start in sequence. Project closeout covers the whole contract. For building projects, see our project closeout checklist.
Yes. Enter your email and the Excel file downloads right away.
Turnover is when the owner takes responsibility for a system: who controls access, who issues permits, and when the warranty starts. The package is what they rely on afterward to operate and maintain it. Missing test records or vendor manuals are a common reason owners refuse a package, and every refusal adds days to the start-up schedule.
This template gives contractors a way to check a package before it goes out and gives both sides a shared tracker of where every system stands. Use it after the mechanical completion checklist and alongside the commissioning checklist.
In Field PM, contractors keep inspection records, photos and documents in the job record, and can build a bound Closeout Book PDF from them. Owners and EPC firms managing many contractors can see how contractors share records live with Client Connect.