Free template for subcontractors

Free Subcontractor Daily Report Template

The daily a sub submits to the GC. Crew, work performed, materials, safety, GC interactions, delays. Used by every trade.

  • Project + your company + GC contact header
  • Crew roster (12 rows) with reg / OT hours
  • Work performed by area with % complete (8 rows)
  • Materials delivered
  • Safety section — incidents, near misses, JSA, toolbox
  • GC interactions / directives / RFIs free-text block
  • Delays / issues impacting schedule
  • Sub Foreman + GC acknowledgement sign-off

Sub Daily Report

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

Does this differ from a regular daily report?

Yes — the subcontractor version adds GC-specific fields (GC contact, GC superintendent, GC interactions / directives / RFIs) and removes GC-level fields you wouldn't fill in as a sub. The bones are the same; the lens is different.

Do I need to send a daily report if I worked 1 hour?

Yes, on most jobs. The GC needs documentation that you were on site and what you did — even a 1-hour visit gets logged. The template adapts to short days by leaving fields blank.

How do I submit this to the GC?

Print and hand-deliver, save as PDF and email, or submit via the GC's portal if they use a PM platform. Field PM's Sub Report feature lets subs submit daily reports directly to the GC inside the platform.

The single document your GC won't stop asking for

A subcontractor daily report is the daily log a sub submits to the general contractor. It's the GC's primary source for project-wide situational awareness, claim documentation, schedule tracking, and payroll backup. Most subcontracts require it; even when they don't, the GC will ask for it.

This template gives you the structure: crew + hours, work performed, materials, safety, the GC-interactions block, and any delays. Fill it out at end-of-shift on a tablet, save as PDF, email it to the GC superintendent before the next morning.

If you're a sub working on multiple jobs, the spreadsheet approach gets old fast. Field PM has a sub-specific report module where your foremen submit from a phone, the GC gets the PDF automatically, and you keep a full audit trail across all your projects. Pair this template with our main daily field report if you also run the GC role.

Rated by contractors on

Field PM reviews on CapterraField PM reviews on GetAppField PM reviews on Software Advice