Free pre-task plan · Excel

Free Pre-Task Plan Template

The daily PTP your foreman fills out at the work area and reviews with the crew before the first tool comes out. Task steps with risk scoring, controls, PPE, permits, emergency info, and crew sign-in / sign-out with initials.

  • Task steps · hazards · controls, in work order
  • Severity × likelihood risk score that colors itself
  • STOP flag on any high-risk step without low residual risk
  • PPE and permit / pre-check yes-no lists
  • Equipment inspection and emergency info blocks
  • Crew sign-in with AM / PM initials and injury-free check
  • End-of-day review + hazard & control library tab

Pre-Task Plan (PTP)

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

Pre-Task Plan

Job info, task steps with hazards, risk score and controls, PPE, permits, equipment, emergency info, crew sign-in with initials, and the end-of-day review — one printable page set.

02

Hazard & Control Library

Starter controls for 20+ common construction hazards — falls, lifts, electrical, excavation, silica, hot work, heat — with OSHA references to copy into the plan.

03

Instructions

How to write the plan in ten minutes, score risk, run the crew review, and when to stop and re-plan.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What is a pre-task plan (PTP) in construction?

A pre-task plan is a short, written safety plan the foreman fills out with the crew at the work area before the task starts, every shift. It lists the steps of today’s work, the hazards in each step, the controls the crew will use, the PPE and permits required, the emergency information for that location, and the signatures or initials of everyone on the crew.

What is the difference between a PTP and a JSA?

A JSA (job safety analysis) is usually written ahead of time for a type of work and kept on file. A PTP is the daily, crew-level version written at the work face for today’s conditions — who is on the crew, what is overhead, what changed since yesterday. Many general contractors require both: a JSA for each scope and a PTP every shift.

Does OSHA require a pre-task plan?

OSHA does not name a "pre-task plan" form. 29 CFR 1926.21(b)(2) requires employers to instruct each employee in recognizing and avoiding unsafe conditions, and many owners and GCs make a daily signed PTP a contract requirement. A completed, signed plan is one of the clearest records that the hazard review actually happened.

Who fills out the PTP and who signs it?

The foreman or crew lead fills it out with input from the crew, reads it out loud at the work area, and every crew member initials it before starting. Anyone who joins later gets the same review. At the end of the shift each person initials out and says whether they are leaving injury-free, and the foreman completes the end-of-day review.

When should a pre-task plan be updated?

Any time the task or conditions change: a new crew member, a new work area, weather, a tie-in to energized equipment, another trade working overhead, a new piece of equipment, or a near miss. Stop, update the plan, and re-review it with the crew before continuing.

Plan the task with the crew, at the work area, every shift

A pre-task plan (PTP) is the daily, crew-level safety plan for today’s work: the steps, what can hurt someone in each step, and exactly how the crew will control it. It is filled out at the work area by the foreman, read to the crew, and initialed by everyone before work starts.

This free template builds the plan around a severity × likelihood risk score, yes/no checks for PPE and permits, the emergency information for that location, and a crew sign-in that also signs people out at the end of the shift. It pairs with a scope-level JSA template — the JSA covers the type of work, the PTP covers today.

When paper plans start piling up in the gang box, Field PM lets foremen fill out PTPs and JSAs on a phone, attach them to the daily report, and file the signed PDF to the project automatically.

The daily pre-task plan, done right

A pre-task plan works when it is short enough to fill out at the tailgate in ten minutes and specific enough that the apprentice feeding wire knows exactly where he is supposed to stand. Most PTPs fail on the second part: every hazard says "pinch points," every control says "be careful," and the crew signs without reading it. This template is built to push the foreman toward specifics — steps in order, a risk score on every step, permits and PPE as yes/no checks, emergency info written at the work area, and a sign-out at the end of the day that asks whether everyone is leaving the way they came in.

What goes on a pre-task plan

SectionWhat to write
Job infoProject, date, shift, company/trade, foreman, exact work area, task, competent person, and the GC contact.
Task stepsThe work in the order it will actually happen — set-up, the work itself, clean-up. Five to eight steps is typical.
HazardsWhat can hurt someone in that step: falls, struck-by, caught-between, electrical, silica, heat, the forklift backing through the area.
Severity × Likelihood1–4 each. The risk score (S × L) turns green, amber or red. Anything 9 or higher gets reviewed with the superintendent before work starts.
ControlsHow the crew will actually do it safely — equipment, barricades, sequence, spotters, LOTO, permits. Specific enough that someone could check it.
PPE & permitsYes/no checks for PPE, and for permits and pre-checks: hot work, confined space, excavation, energized work, LOTO, crane lift, scaffold tag, aerial lift inspection, GC permit to work.
EquipmentEach lift, puller, saw or tool that needs a pre-use inspection, who inspected it, and any defects.
Emergency infoThe address 911 needs, muster point, nearest hospital and clinic, who on the crew has first aid/CPR, first aid kit, extinguisher, eyewash/AED, and how you would get someone down from height.
Crew sign-inName, craft, AM initials after the review, fit for duty, PM initials, and whether they left injury-free.
End-of-day reviewDid the plan change, any injuries or near misses, permits closed, LOTO handed off, housekeeping, equipment secured, and what to change tomorrow.

How to fill out a PTP in 10 minutes

  1. Walk the area first. Look up, look down, look around. What is overhead? Who else is working here? Where are the openings, the cords, the traffic?
  2. Write the steps in order. If you can’t list the steps, the crew isn’t ready to start.
  3. Let the crew name the hazards. The person doing the step knows where the pinch point is. Write down what they say.
  4. Score each step honestly. Severity is the worst credible outcome, not the likely one. Likelihood is what happens if nothing changes.
  5. Write real controls. "Red danger tape 6 ft out from the lift footprint" is a control. "Be aware of surroundings" is not.
  6. Check permits and PPE. Any permit marked N means that step waits.
  7. Fill in emergency info at the work area. The address 911 needs is not always the project address — gates, buildings and levels matter.
  8. Read it out loud and get initials. One voice, whole crew, before anyone picks up a tool.

Writing controls that mean something

Most pre-task plans are weakest in the controls column. Use the hierarchy of controls: eliminate the hazard if you can, engineer it out, then administrative controls, then PPE. A few examples from the field:

  • Weak: "Watch for falling objects." Strong: "Tools tethered on the lift. Barricade below with red danger tape until the lift is lowered. No one enters the barricade without talking to the lift operator."
  • Weak: "Electrical hazard — use caution." Strong: "Feeder breaker locked and tagged by each worker. Test before touch with a meter verified on a known source. Adjacent energized panel stays closed; any work inside it needs an energized work permit."
  • Weak: "Wear PPE." Strong: "Cut-level gloves while stripping cable; face shield and hearing protection while cutting unistrut with the chop saw."
  • Weak: "Heat." Strong: "Water cooler at the stair tower, 10-minute shade break every hour after noon, buddy checks, new apprentice on half-exposure the first week."

The template’s Hazard & Control Library tab has starter language for more than 20 common construction hazards with the OSHA references, so the foreman can copy a solid control and adjust it to the day.

Risk scoring: severity × likelihood

The template uses a simple 4 × 4 matrix. Severity: 1 = first aid, 2 = recordable or lost time, 3 = serious injury or hospitalization, 4 = fatality or permanent disability. Likelihood: 1 = very unlikely, 2 = possible, 3 = likely, 4 = expected if nothing changes. The score colors itself: 1–3 green, 4–8 amber, 9–16 red. When a step scores 9 or higher, the Status column reads STOP — review controls until the residual risk after controls is marked Low. That rule gives the superintendent a clear trigger to look at the plan before the work starts, not after.

Crew sign-in and end-of-day sign-out

A sign-in sheet at the bottom of the plan is what turns it from paperwork into a crew agreement. Each person initials in the morning only after the plan has been read to them, and marks whether they are fit for duty. At the end of the shift they initial out and mark whether they are leaving injury-free. The sheet flags anyone not signed in, not signed out, not fit for duty, or reporting an injury — so an unreported first-aid case shows up the same day instead of three days later as a recordable with no incident report behind it.

PTP vs JSA vs JHA vs THA

  • JSA / JHA (job safety analysis / job hazard analysis): written for a type of work, usually ahead of time, reviewed by the safety department. Use our JSA template or JHA template.
  • PTP (pre-task plan): the daily, crew-level plan for today’s conditions, written at the work area.
  • THA / DAP / STA: task hazard analysis, daily activity plan, safe task analysis — different names GCs use for the same daily plan. This template fits any of them.

Common pre-task plan mistakes

  1. Copying yesterday’s plan. If the PTP is identical every day, nobody is reading it. Conditions change daily.
  2. Filling it out in the truck. Write it at the work area, where you can see the hazards.
  3. Generic hazards and controls. "Slips, trips and falls" on every line tells the crew nothing.
  4. Not updating when the task changes. The worst incidents happen after lunch, when the crew moves to "one quick thing" that wasn’t on the plan.
  5. Signatures without a review. Initials mean the plan was read to the crew. If it wasn’t, the signatures are worse than useless in an investigation.
  6. No emergency info. The time to figure out the gate address and how to get someone off a lift is not during the emergency.

Moving PTPs off paper

Paper PTPs get rained on, lost in gang boxes, and filed in a box nobody can search. When the GC or an OSHA compliance officer asks for the plan the crew signed on a specific morning, you want it in thirty seconds. Field PM lets foremen fill out JSAs, PTPs and safety forms on a phone, attach them to the daily report, capture crew signatures, and file the PDF to the project’s safety folder automatically. See the safety features or start a free trial.