Free QA/QC template · Excel

Free NCR Template: Non-Conformance Report + Log

A one-page non-conformance report form and an NCR log for the whole job. Disposition, root cause, corrective and preventive action, verification and sign-off.

  • ✓Identification block: location, tag, drawing, supplier
  • ✓Description and the requirement not met
  • ✓Disposition: use as is, repair, rework, reject, return
  • ✓Root cause plus corrective and preventive action
  • ✓Verification and closure sign-off
  • ✓NCR log with days open, overdue flag and counts

NCR Template

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

NCR Form

Six sections from identification to closure, with dropdowns for severity, disposition and cause, and a three-party sign-off.

02

NCR Log

Every NCR on the job in one register. Days open counts until closed, overdue actions are flagged, and the summary counts open, major and each disposition.

03

Instructions

How to fill each section, when Use as is and Repair need approval, and how to run a weekly NCR review.

Share this live with your client

A nonconformance is a quality problem the owner may have to accept, reject, or pay to fix. Owners want to know about them early, with the disposition and the fix on record.

In Field PM, your QA/QC inspections can be shared live with your client, item by item, from your own account.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What is an NCR in construction?

A non-conformance report (NCR) records work, material or equipment that does not meet a stated requirement: a drawing, specification, code or approved procedure. It describes the problem, how it will be dealt with (the disposition), why it happened, and how the fix was verified before the NCR is closed.

What are the usual NCR dispositions?

This template uses five: Use as is, Repair, Rework, Reject and Return to supplier. Rework and Reject bring the item back to the specified condition. Use as is and Repair leave it different from the documents, so they normally need engineer approval and often client approval. Your contract may define these differently.

What is the difference between corrective and preventive action?

Corrective action fixes the item that was found. Preventive action stops the same problem happening again, for example a procedure change, retraining, or action with a supplier. The form has a box for each.

How does the NCR log calculate days open?

Days Open is the date closed minus the date raised. Until a close date is entered it counts up to today, so old NCRs stand out. The summary at the top counts total and open NCRs, major and critical NCRs, and each disposition.

Who raises an NCR, the contractor or the owner?

Either. Contractor QA/QC raises NCRs on its own work and on suppliers. Owners, EPC firms and third-party inspectors raise them on contractors. The log works for both: the Responsible Party column records whose work it is.

Is the template free?

Yes. Enter your email and the Excel file downloads right away. No credit card.

Why the NCR matters to the owner

An NCR is the written record that something was built or supplied differently from what the contract asked for, and of what was done about it. For the contractor it limits arguments later: the problem, the decision and the fix are on paper with signatures. For the owner it is part of the quality record they keep after handover. A system with open or poorly closed NCRs is a system the owner will be cautious about accepting.

This template keeps the form short enough that field QC will actually use it. The log is what project managers and owners look at: how many are open, how long they have been open, and whether the same cause keeps coming back. Use it with an inspection and test plan so every NCR can point to the ITP step where it was found.

Field PM runs QA/QC inspections, corrective and preventive actions and calibration records from the field, with photos and sign-off. See QA/QC software. If you are an owner or EPC firm managing many contractors, see how contractors can share their records with you.

Rated by contractors on

Field PM reviews on CapterraField PM reviews on GetAppField PM reviews on Software Advice