Free finish schedules · Excel

Free Door, Room Finish & Paint Schedules

Door/frame/hardware, room finish, and paint color schedules in one workbook, plus a framing inspection checklist, drywall finish level (0–5) verification, and a cut list.

  • Door schedule: size, type, material, frame, fire rating, hardware set
  • Hardware set count for the submittal and order
  • Room finish schedule with floor SF, base LF, and wall SF
  • Paint schedule: rooms, wall SF, and gallons from each code
  • Framing inspection checklist with a "Ready to board?" result
  • Drywall finish level 0–5 verification with Level 5 flags
  • Cut list: total LF, waste, and stock pieces to order

Finish Schedules

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

Door Schedule

Every opening with size, door and frame type and material, fire rating (rated openings highlighted), hardware set, glazing, and a hardware set count.

02

Room Finish Schedule

Floor, base, walls, paint code, ceiling, and ceiling height by room, with calculated floor SF, base LF, and gross wall SF.

03

Paint Color Schedule

Code, manufacturer, color name and number, sheen, and location, with rooms using each color, wall SF, and a gallon estimate.

04

Framing Inspection

A pre-board checklist covering layout, members, backing, fire and smoke, and MEP coordination. It won't say ready to board until every deficiency is corrected.

05

Drywall Finish Level

Levels 0–5 explained in plain language, plus a specified-vs-verified log by area that flags rooms needing Level 5.

06

Cut List

Lengths in feet and inches × qty → total LF, LF with waste, and stock pieces to order.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What goes on a door schedule?

One row per opening: door number (matching the floor plan), room or location, size (width, height, thickness), door type and material, finish, frame type and material, fire rating, hardware set, glazing, and remarks. The hardware set number connects each opening to the hardware schedule in the spec. This template also counts openings per hardware set so you can check the hardware submittal.

What is the difference between a room finish schedule and a paint schedule?

The room finish schedule lists, room by room, which finish goes on the floor, base, walls, and ceiling, plus the ceiling height, using codes like CPT-1, RB-1, and P-2. The paint color schedule says what each paint code actually is: manufacturer, color name and number, sheen, product, and where it goes. In this template the paint schedule reads the room schedule to count rooms and wall area for each color.

What are the drywall finish levels 0 to 5?

They describe how much taping and finishing the gypsum board gets. Level 0 is no finishing at all. Level 1 is tape set in compound, typical above ceilings and for fire taping. Level 2 adds a thin coat, used in garages and under tile. Level 3 is for heavy texture. Level 4 is the usual commercial finish for flat paint. Level 5 adds a skim coat over the whole surface for gloss paint or critical lighting. The levels are defined in the Gypsum Association's GA-214. Your spec section governs.

When should I push for a Level 5 finish?

Any time a wall or ceiling will get semi-gloss or gloss paint, or will be lit at a low angle, such as daylight raking down a corridor from a window or wall-wash fixtures in a conference room. Level 4 joints can show in that light. The drywall tab flags these rooms so the question gets settled with the architect before the painter starts.

How does the cut list calculate material?

Enter each piece's length in feet and inches, the quantity, a waste percentage, and the stock length you buy. It calculates total linear feet, linear feet with waste, and stock pieces to order, rounded up. It doesn't optimize how cuts nest into stock lengths, so group those by hand when the material is expensive.

Doors, rooms, and paint in one place

Finish schedules are how the drawings tell the field what goes where: which door and hardware set at each opening, which floor, base, wall, and ceiling finish in each room, and what each paint code means. This free Excel workbook puts all three together so you can sort, filter, and check them against submittals.

It also includes three field checks. A framing inspection before board goes up, a drywall finish level verification before primer (GA-214 Levels 0–5, described in plain language), and a cut list for ordering studs, track, trim, and base. When a finish miss does get through, log it on the punch list template.

Field PM keeps finish submittals, RFIs, QC inspections, and punch items with photos on the job, so the approved finish is what gets installed.

Interior finish schedules in one workbook

Architectural finish information is usually spread across the A-600 schedule sheets, the finish legend, spec Division 09, and a hardware schedule that comes in three submittals later. The superintendent and the finish subs still need it in one place they can sort, filter, and mark up. This workbook puts the three core schedules (doors, room finishes, paint colors) together with the three field checks that decide whether interiors go well: framing inspection before board, drywall finish level before primer, and a cut list for ordering.

Door, frame & hardware schedule

Use one row per opening, numbered to match the floor plan. The columns follow the usual A-600 layout: door number, room/location, width, height, thickness, door type (elevation letter), door material (HM, WD, AL, FRP, glass), door finish, frame type and material, fire rating, hardware set, glazing, and remarks.

  • Fire-rated openings turn red. A rated opening needs a labeled door and a labeled frame, rated glazing if it has a lite, and self-closing, positive-latching hardware. Check the rating against the wall type on the life-safety plan, not just the door schedule. The two sometimes disagree, and that's an RFI. Requirements come from NFPA 80 and IBC Section 716 as adopted by your AHJ.
  • The hardware set count at the bottom counts openings per set. Compare it with the hardware submittal before anything is ordered. A miscounted set is the most common reason a building sits waiting on hardware at the end of the job.
  • Remarks is where coordination goes: card readers, electrified hardware, silencers for acoustics, swing direction, kick plates.

Room finish schedule

Use one row per room: floor, base, walls, wall paint code, ceiling, and ceiling height, using the codes from the finish legend (CPT-1, LVT-1, RB-1, P-2, ACT-1). Enter the room's length and width and the sheet calculates:

OutputFormulaUse it to check
Floor Area (SF)Length × widthFlooring takeoff
Base (LF)2 × (length + width)Base takeoff, before deducting doors
Wall Area Gross (SF)Base LF × ceiling heightPaint and wallcovering takeoff

These are gross numbers for rectangular rooms. Deduct openings (about 3 LF of base and 21 SF of wall for each 3'-0" × 7'-0" door) and add soffits, bulkheads, and returns by hand. They are quick checks against a takeoff, not a replacement for one. For a full takeoff, use the quantity takeoff template.

Paint color schedule

Use one row per paint code: manufacturer, color name, color number, sheen, product line, substrate, location, primer, and number of finish coats. Two columns are calculated from the room finish schedule:

  • Rooms Using: how many rooms list that code as their wall paint. A code with zero rooms is either an accent color used on elevations or a leftover from an earlier revision.
  • Wall SF: the gross wall area of those rooms. Enter the coverage rate from the product data sheet and the sheet estimates gallons (wall SF × coats ÷ coverage).

Pick sheen by use: flat or matte for ceilings and low-traffic walls, eggshell for most offices and corridors, semi-gloss for doors, frames, and wet areas, epoxy where the spec calls for washable, high-abuse surfaces. Higher sheen shows every joint, which is where the drywall finish level comes in.

Framing inspection checklist

This is the last chance to fix anything inside a wall cheaply. The checklist covers layout and rough openings, stud size, gauge, and spacing, track fastening, deflection track, headers and jambs, plumb and straight, backing for everything wall-mounted, rated walls built to the listed design and taken to deck, fireblocking (IBC Section 718, verify against your AHJ's edition), MEP rough-in inspected before close-in, penetrations within punch-out limits, insulation, and control joints. Each item gets Yes / No / N/A, and each "No" gets a location and a corrected date.

"Ready to board?" stays at NO until every item is answered and every deficiency has a correction date. Missing backing is the finding that costs the most later. Once board is hung, a grab bar or wall-mounted TV without backing means cutting and re-patching finished wall.

Drywall finish level verification

The top of the tab summarizes Levels 0–5 in plain language: what the finisher does at each level and where it's typically used. Levels are defined in GA-214 (Gypsum Association, Recommended Levels of Gypsum Board Finish) and referenced by ASTM C840 and most 09 29 00 spec sections. The spec on your job governs.

The verification log records, for each area and surface: the specified level, whether the space has critical lighting or gloss paint, the level actually verified, and who checked it. Result shows MEETS SPEC or BELOW SPEC. Flag shows Consider Level 5 when a room has critical lighting or gloss paint but the spec calls for Level 4 or lower. Raise that with the architect before primer. Once the painter has rolled the wall, it's a dispute about who pays to fix it.

Check finish under the lighting the room will actually have. A work light held flat against the wall shows what a raking window or wall-washer will show later.

Cut / material list

Enter item, material, size or profile, length in feet and inches, quantity, waste %, and stock length. The sheet returns total LF, LF with waste, and stock pieces to order (rounded up to whole sticks or rolls). It works for metal studs and track, furring and hat channel, corner bead, trim, base, and backing. Filter by material before you send the order, because the totals mix materials.

Related free templates

Field PM keeps submittals, RFIs, punch lists, and QC inspections with photos in one place, so the finish that was approved is the finish that gets installed. Start a free 30-day trial.

Rated by contractors on

Field PM reviews on CapterraField PM reviews on GetAppField PM reviews on Software Advice