Free Excel template · EPC & turnover
Plan the work in packages and only hand a crew a package when everything it needs is in place. CWP register and definition, IWP register with constraint tracking, and an IWP form for the foreman.
We'll email you a copy + send the file to your browser right now.
By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.
Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.
01
Each CWP with area, discipline, scope boundary, dates and budget hours, rolled up from its IWPs: hours packaged, ready, complete. Plus a one-page definition form.
02
Every installation work package with crew, hours and constraint status for drawings, materials, tools, scaffold, permits and prior work. Ready to Issue calculates itself.
03
The package the foreman gets: scope, work steps, materials, drawings, hazards and permits, quality hold points, and a close-out section for feedback.
Want this automated?
Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.
30 days free · no credit card · every feature unlocked from day one.
Paper / Excel
Field PM
On your phone & tablet
This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:
The platform behind the templates
A CWP is a slice of the project, usually one area and one discipline, sized so it can be planned, built and tracked on its own. It defines the scope, its boundaries with other packages, the engineering and materials it depends on, dates and budget hours.
An IWP is a piece of a CWP sized for one crew, typically one to two weeks of work. It holds what the foreman needs: scope, work steps, drawings, materials list, safety requirements and quality hold points.
The IWP has no open constraints: current drawings, materials on site, tools and equipment, scaffold and access, permits, and prior work released. The template counts open constraints and only marks the package Ready when every one is Cleared or N/A.
No. It follows the common CWP and IWP structure used in advanced work packaging, written in plain terms. Owners and EPC firms often have their own package formats; adapt the columns to match.
Mostly industrial, energy and EPC projects, but any contractor can use the idea: do not send a crew to work until everything it needs is in place. Owners use the CWP register to see how much of the scope is planned and ready.
Yes. It is a standard .xlsx file with no macros or locked cells. Enter your email and it downloads right away.
Crews lose hours waiting for a drawing revision, a missing spool, a scaffold that is not up, or a permit nobody pulled. Work packaging attacks that directly: break the job into packages, list everything each package needs, and only release it to the crew when every item is cleared. This template gives you the registers and forms to run that process in a spreadsheet.
Construction managers and planners on industrial and EPC jobs use the CWP register to see how much of the scope is planned and how many packages are ready. Superintendents use the IWP register in the weekly planning meeting to chase open constraints. Foremen get a single package with everything for the next week or two.
Measure what each package earns with the rules of credit template, look ahead with the three-week look-ahead, and attach a JSA to each IWP.
In Field PM, foremen report hours and quantities by phase code every day, and the schedule, daily reports and progress can be shared live with the owner or EPC from the contractor's own account.