Free backcharge notice · Excel

Free Backcharge Notice Template & Log

Notice the responsible sub, give them the chance to cure, document the cost of correction, and track every backcharge from issued to collected.

  • Backcharge notice to the responsible subcontractor
  • Deficiency description, subcontract & spec reference
  • Notice-to-cure period with calculated cure deadline
  • Labor / material / equipment / other cost breakdown + markup
  • Photo & document references and sub acknowledgement
  • Backcharge log: issued, accepted, disputed, collected, balance
  • Days open aging and by-subcontractor rollup

Backcharge Notice + Log

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

Backcharge Notice

Deficiency or damage, contract reference, notice to cure with deadline, itemized cost with markup, photos, and the sub's acknowledgement and response.

02

Backcharge Log

Every backcharge on the job with status, issued / accepted / disputed / collected amounts, balance to collect, days open, and totals by subcontractor.

03

Instructions

Document, notice, cure, cost, collect — the process that makes backcharges stick. Not legal advice.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What is a backcharge in construction?

A backcharge is a cost a contractor charges back to a subcontractor (or a sub to its lower tier) for work the contractor had to perform or pay for because of the sub — correcting defective work, repairing damage the sub caused, cleanup the sub failed to do, or scope the sub didn't perform. It is usually deducted from the sub's next payment.

Do I have to give notice before backcharging a subcontractor?

Usually, yes. Most subcontracts require written notice and a chance to cure before you correct the work with other forces and charge it back. Skipping notice is the most common reason backcharges get disputed and lost. Your subcontract controls the notice method, cure period, and allowed markup — read it first. This template is not legal advice.

What should a backcharge notice include?

The responsible sub, the subcontract and spec or drawing reference, a specific description of the deficiency or damage with location and date discovered, the cure period and deadline, a cost breakdown (labor, material, equipment, other, markup), photos and supporting documents, and an acknowledgement block for the sub.

How much markup can I add to a backcharge?

Whatever the subcontract allows. Many subcontracts set a percentage for overhead and profit on backcharges; some are silent, which invites a dispute. The template has a single Markup % cell so you can apply your contract rate consistently.

How do I track backcharges across a project?

Use the Backcharge Log tab: one row per notice with status, amount issued, accepted, disputed, collected, balance to collect, and days open, plus a by-subcontractor rollup for pay-app reviews and closeout.

A backcharge is only as good as the notice behind it

A backcharge recovers the cost of correcting a subcontractor's defective work, repairing damage they caused, or doing cleanup and scope they didn't. Most subcontracts require written notice and an opportunity to cure before you correct the work with other forces — skip that step and the backcharge becomes a negotiation.

This free template gives you a complete backcharge notice (deficiency, notice to cure, itemized cost with markup, photos, acknowledgement) and a backcharge log that tracks issued, accepted, disputed, and collected amounts for every sub on the job. Read your subcontract's notice, cure, and backcharge clauses first — this is not legal advice.

Back up correction work with a signed time and material ticket, and record the condition the day you find it on a daily field report.

How to backcharge a subcontractor the right way

Every superintendent has a story about the backcharge that went nowhere. The drywall sub's lift gouged a finished corridor, your painter fixed it, you deducted $2,400 from their next pay app — and three months later it's still "in dispute," the sub is holding up their closeout docs, and the PM is splitting the difference just to get the job closed. Nine times out of ten the problem wasn't the facts. It was the process: no written notice, no chance to cure, no backup for the number.

The free backcharge notice template above fixes the process. It gives you a backcharge notice that covers notice, cure, and cost in one document, and a backcharge log that tracks every one from issued to collected.

Not legal advice. Your subcontract controls whether and how you can backcharge. Read the notice, cure, cleanup, and backcharge clauses — and the deadlines in them — before you send anything.

The backcharge process, step by step

  1. Document it before anyone touches it. Photos with dates, location, and scale. Note it on the daily report. Tell the sub's foreman on site the same day and write down who you told.
  2. Check the subcontract. Find the notice requirement, the cure period, who must receive notice, and the markup allowed on backcharges. The prime contract usually has a parallel clause — AIA A201-2017 §2.5, for example, gives the owner the right to carry out work the contractor neglects after a 10-day notice-and-cure period — and your subcontract likely flows something similar down to your subs.
  3. Send written notice with a cure period. Describe the deficiency specifically, cite the spec or drawing, set the cure deadline, and say what happens if they don't cure. The template calculates the cure deadline from the notice date.
  4. Give them the chance to fix it. Unless it's a safety emergency, let the responsible sub correct it. A cured deficiency is a closed problem and a preserved relationship.
  5. If they don't cure, correct it and track the cost. Use your own forces on T&M tickets or another sub on a separate PO. Keep sign-in sheets, material receipts, and equipment records.
  6. Issue the backcharge with backup. Labor, material, equipment, other, and markup per the subcontract. The template subtotals by category and applies your markup %.
  7. Log it and collect it. Enter it on the Backcharge Log, update the status as the sub responds, and deduct accepted amounts on the next pay application.

What goes in a backcharge notice

SectionWhat to include
NoticeBackcharge number, notice date, notice type (notice of deficiency, backcharge invoice after cure, emergency correction, final), delivery method.
To / FromThe responsible subcontractor and the person the subcontract says receives notices.
Contract / spec referenceSubcontract number, the cleanup / right-to-cure / backcharge clauses, and the spec section or drawing the work violates.
1. Deficiency or damageType, exact location, date discovered, who found it, and a specific description. "Damaged walls" loses; "12 LF of finished GWB gouged by scissor lift at corridor 2-110, 4'-6" AFF" wins.
2. Notice to cureCure period, calculated cure deadline, who corrects it, and the plain-language consequence of not curing.
3. Cost breakdownLine items by category with quantity, unit, and rate; category subtotals; markup %; total.
4. Photos & documentsPhoto numbers, daily report reference, T&M tickets, invoices, and whether each is attached.
5. AcknowledgementThe sub's response (accepted, accepted in part, disputed, will correct), accepted amount, recovery method, and signatures. Signature acknowledges receipt only unless they accept.

Common reasons for backcharges

  • Damage to other trades' work — lifts striking finished walls or installed conduit, core drilling without slurry containment, overspray, broken glass.
  • Failure to clean up — the most common and most disputed. Issue written cleanup notices first; backcharge only after the cure period passes.
  • Defective or nonconforming work — slab out of tolerance, work not per spec, failed inspections requiring rework by others.
  • Unperformed scope — items in the sub's scope that you had to complete.
  • Schedule and manpower failures — supplementing a sub's crew after a written notice of default.
  • Warranty call-backs the sub won't respond to.

Why backcharges get disputed (and how to avoid it)

No notice or no chance to cure

If the subcontract requires notice and an opportunity to cure and you skipped it, you've given the sub their best argument. Even when the subcontract is silent, notice is simply fair and makes the charge stick.

No backup

A lump sum with no hours, rates, or receipts is a number the sub will negotiate down. Signed T&M tickets for your own forces — or the correcting contractor's invoice — make it a number they can't.

Wrong sub

On a busy floor, three trades could have damaged that wall. Photos, the daily report, and a witness statement from the foreman prove who did it. When you truly can't tell, cleanup and damage are sometimes split among trades per the subcontract — say so in the notice.

Waiting until closeout

Backcharges that appear on the final pay app as a surprise look like leverage, not cost recovery. Issue them when they happen and deduct them monthly.

How the Backcharge Log works

One row per notice: BC number, responsible sub, description, type, notice date, cure days, status, and dollars. The log calculates:

  • Cure By — notice date plus cure days; highlighted red if past due and the sub hasn't responded.
  • Disputed $ — issued minus accepted, when the status is Disputed or Partially accepted.
  • Balance to Collect — accepted minus collected: money the sub agreed to that you haven't recovered yet.
  • Days Open — from notice until Collected or Withdrawn; amber over 30 days, red over 60.

The summary shows total issued, accepted, disputed, collected, amounts awaiting a response, and your recovery rate. A by-subcontractor table rolls up each sub's totals — the number you want in front of you at the monthly pay-app review and at closeout.

Backcharges and pay applications

Accepted backcharges are normally recovered as a deduction on the sub's next pay application, shown as a separate line so the math is visible. Some contracts let you offset against retainage, and small ones sometimes get paid by check. Whatever the method, record it in Collected $ only when the money actually comes off — that keeps Balance to Collect honest.

If you're tracking backcharges alongside daily reports, T&M tickets, subcontracts, and vendor invoices in separate spreadsheets, the backup is always somewhere else when you need it. Field PM keeps field reports, photos, T&M, POs, and subcontractor pay apps on the same job, so the evidence for a backcharge is already attached. Start a free 30-day trial.