The weekly report owners actually read: where the job stands against plan, what is next, what is open, and what you need from them. Percent complete by phase with progress bars that update as you type.

  • ✓Planned vs actual % complete by phase (weighted)
  • ✓In-cell progress bars, no charts to break
  • ✓Work completed and next week look-ahead
  • ✓Open RFIs and pending change orders
  • ✓Issues and risks with owner and due date
  • ✓Safety numbers and photo references

Weekly Progress Report

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

Weekly Report

Key numbers, summary, work completed, look-ahead, open RFIs and change orders, issues and risks, safety, photos and sign-off. Prints on letter size.

02

Progress by Phase

Weight each phase by budget, enter planned and actual %, and get weighted overall progress, variance, status flags and bars.

03

Instructions

How to fill it out each week and what owners look for in a progress report.

Share this live with your client

The weekly report is the owner's summary of the job: percent complete, what is next, and what needs a decision from them.

In Field PM, your progress by phase code, daily reports and photos can be shared live with your client, item by item, from your own account.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What goes in a construction weekly progress report?

A short summary of the week, percent complete against plan, work completed, next week's look-ahead, open RFIs and pending change orders, issues and risks with an owner and date for each action, safety numbers for the week, and photo references. This template has a section for each.

How is percent complete calculated?

On the Progress by Phase tab you give each phase a weight (its budget in dollars or hours) and enter planned and actual percent complete. Overall percent complete is the weighted average, and the report tab pulls it in automatically with an in-cell progress bar.

Who sends the weekly progress report?

Usually the contractor's project manager sends it to the owner or owner's representative, often before a weekly owner meeting. Subcontractors send a version of it to the GC.

What do owners want to see in it?

Whether the job is on schedule, what is behind and why, what decisions or information they owe the contractor, any cost exposure from pending changes, and safety. Bad news reported early builds more trust than a report that only shows good news.

Weekly or monthly report: do I need both?

Many owners ask for a short weekly report and a fuller monthly report with cost and safety statistics. The free contractor monthly report template covers the monthly version.

Is it free to edit?

Yes. It is a standard .xlsx with no macros or locked cells, and it works in Excel, Google Sheets and Numbers.

A weekly report that answers the owner before they ask

A construction weekly progress report is the contractor's regular check-in with the owner. Done well, it keeps the owner from calling the site to ask where things stand, and it gets decisions made on time because it says plainly what the contractor needs and by when.

This template keeps the report to what owners read: a few key numbers, a short summary, percent complete by phase against plan, next week's look-ahead, open RFIs and change orders, issues and risks with a named owner, and safety. Progress is weighted by each phase's budget, so a small phase finishing does not make the whole job look further along than it is.

Pair it with the free three-week look-ahead, the S-curve template and the contractor monthly report for the fuller monthly version.

In Field PM, percent complete by phase code comes from the quantities crews report in their daily reports, so the numbers are there without a separate spreadsheet. Owners and GCs who hire several contractors can see how that information is shared on the multi-site construction program page.

Rated by contractors on

Field PM reviews on CapterraField PM reviews on GetAppField PM reviews on Software Advice