Ask every supplier the same question so the answers compare. Request-for-quote form with delivery requirements, spec sections, line items, and commercial terms — plus a quote log that tracks every RFQ out and every quote back.

  • Project, quote due date, buyer, and supplier blocks
  • Delivery requirements — on-site date, access, unloading, tagging, storage
  • Spec sections included in the RFQ
  • 25 line items: qty · unit · description · spec § · basis of design · substitutions
  • Supplier fills unit price & lead time — extended, tax, and total calculate
  • Freight, tax, lead time, validity, escalation, payment terms + signed acknowledgement
  • Quote Log: sent / due / received, days to respond, total delivered, rank by package

Supplier RFQ Template

We'll email you a copy + send the file to your browser right now.

Excel (.xlsx) · works in Excel, Google Sheets, Numbers

Want it with your logo on it?

A free account puts your logo, company info, and license # on every template, and adds one-click template packs. Free forever, even after the trial.

Get branded templates free →

By downloading you agree to receive occasional Field PM updates. Unsubscribe anytime. We don't share your email — read our privacy policy.

What's inside the workbook

Pre-formatted, print-ready, with embedded Field PM branding. Works in Excel, Google Sheets, and Numbers.

01

RFQ

The document you send: header, delivery requirements, spec sections, line items with live extensions, commercial terms with dropdowns, exceptions box, and supplier acknowledgement signature.

02

Quote Log

One row per vendor per package — dates, response, days to respond, quoted $, freight, total delivered, rank, lead time, and valid-until with overdue and expired flags.

03

Instructions

How to fill each section, which terms to insist on, and how to hand quotes off to the bid leveling matrix.

Want this automated?

Stop re-typing the same form on every job.

Field PM has this exact form built in — crews fill it out from a phone, the data flows into the project record, and you get a clean PDF for the GC or owner with one click. No re-typing, no lost paperwork, no missed signatures.

30 days free · no credit card · every feature unlocked from day one.

Paper / Excel

  • ✗ Hand-writes the form on the jobsite
  • ✗ Re-types into Excel at the trailer
  • ✗ Emails the PDF back to the office
  • ✗ No audit trail, no signatures
  • ✗ Data never feeds payroll or the budget

Field PM

  • ✓ Fill out from a phone in under 3 min
  • ✓ Photos, signatures, and audit log built in
  • ✓ One-click PDF for the GC and owner
  • ✓ Data feeds payroll, budget, and reports
  • ✓ Replaces 5 forms with one platform

On your phone & tablet

Every template — in the app, in your pocket

This template and every other one is built into the Field PM app. Fill them out right from the jobsite on any iPhone, iPad, or Android — photos, signatures, and a clean GC-ready PDF included. Download free:

Download on theApp StoreGet it onGoogle Play

Frequently asked questions

What is a supplier RFQ in construction?

A request for quote (RFQ) is the package a contractor sends to material suppliers, distributors, and manufacturer reps asking for pricing on a defined list of materials. A good RFQ includes the project, quote due date, delivery requirements, the spec sections that apply, line items with quantities and basis of design, and the commercial terms you need quoted — freight, tax, lead time, and how long the price is good.

What is the difference between an RFQ and an RFP?

An RFQ asks for price on a defined list — you already know what you need. An RFP (request for proposal) asks the vendor to propose a solution and price it, and is usually evaluated on more than price. Contractors typically use RFQs for materials and equipment, and bid invitations or RFPs for subcontracted scope.

What terms should I ask suppliers to quote?

At minimum: freight (FOB jobsite with freight allowed, or prepay and add), sales tax (included, excluded, or exempt), lead time and what it is based on (ARO or after approved submittals), how long the quote is valid, price escalation on copper and steel, payment terms, restocking and return policy, and any minimum-order, cut, or reel charges.

How do I compare the quotes once they come back?

The Quote Log tab calculates total delivered (quoted price plus freight and other charges) and ranks each vendor within its package. To compare line by line and level inclusions and exclusions, use the free Bid Leveling Matrix at /templates/bid-leveling-matrix — it has a supplier quote comparison sheet built in.

Is an RFQ a binding order?

No. An RFQ requests pricing only. The purchase order or subcontract sets the terms of the actual purchase, so make sure your PO terms match what the supplier quoted — especially freight, lead time, and escalation.

Same request, comparable quotes

A supplier RFQ is the request contractors send to distributors and manufacturer reps for material pricing. When every supplier gets the same delivery requirements, spec sections, line items, and terms, the quotes that come back can actually be compared.

This free template gives you a clean RFQ form plus a quote log that tracks response rate, days to respond, total delivered, and rank within each package. When quotes are in, level them line by line in the free bid leveling matrix.

Once you award, Field PM turns the quote into a purchase order against your job budget and ties receipts and vendor invoices back to it.

How to write a supplier RFQ that gets comparable quotes

Every estimator has had it happen: you send the same material list to three suppliers and get back three quotes you can't compare. One is FOB shipping point, one excludes the lighting controls, one has copper pricing good for seven days and a gear lead time that blows your schedule. The problem usually isn't the suppliers — it's the request. A clear request for quote (RFQ) asks every supplier the same question, so the answers line up. The free template above gives you the RFQ document and a quote log to track every request out and every quote back.

What goes in a supplier RFQ

1. RFQ and project information

RFQ number, date issued, and — in bold — the quote due date and time. Set it two to three business days before your own bid is due so you have time to level quotes and chase missing ones. Include the project name, jobsite address, the drawing and spec set date, addenda through #, and who the quote goes to.

2. Delivery requirements

This is where most quote differences come from. Tell suppliers what drives their cost:

  • Required on-site date and whether you need phased releases
  • Where and when to deliver — gate, receiving hours, call-ahead requirement
  • Truck and unloading limits — dock height, trailer length, liftgate or boom truck, who unloads
  • Packaging and tagging — tag by floor and area, panel IDs on gear crates
  • Submittals — product data due within X days of PO
  • Storage — do you need the supplier to warehouse gear until the building is ready?

3. Specification sections

List every spec section the quote must comply with. Suppliers price what's on the RFQ — if the lighting control section isn't listed, don't expect it in the quote. Use the section numbers from your project manual.

4. Line items

Quantity, unit, a specific description, spec section, manufacturer or basis of design, and whether substitutions are allowed (or-equal, no substitutions, or submit for approval). The supplier fills in unit price, lead time, and notes; the sheet extends each line and totals the quote. The template ships with an example electrical package — panelboards, distribution, transformers, safety switches, EMT, THHN, LED troffers, and lighting controls — that you can overwrite for mechanical, plumbing, or any material buy. Need a labor side to go with the material? See our electrical labor units reference.

5. Commercial terms

TermWhy it matters
FreightFOB jobsite with freight allowed vs. prepay-and-add vs. FOB shipping point can swing a gear quote by thousands.
Sales taxIncluded, excluded, or exempt. If excluded, the sheet adds tax at the rate you enter so totals compare.
Lead time basis"14 weeks" means nothing until you know if it's after receipt of order or after approved submittals.
Quote validityCopper wire and switchgear prices move weekly. A quote that expires before award is a number you can't hold.
Price escalationFirm through delivery, or subject to a metals escalator? Ask for the index and the base.
Payment, returns, minimumsNet terms, restocking fees, cut and reel charges, minimum orders — small individually, real in aggregate.

6. Supplier acknowledgement

Ask the supplier to sign, list their quote number, and confirm the addenda they included. A signed acknowledgement ends the "we didn't see addendum 3" conversation — and exceptions have a place to be written down instead of buried in a footnote.

The quote log: who did you ask, who answered?

On a busy bid day you might send a dozen RFQs across four packages. The Quote Log tab tracks each one: package, vendor, contact, date sent, quote due, follow-up date, date received, response (awaiting, received, declined, no response), days to respond, quoted amount, freight, total delivered, rank within the package, lead time, and valid-until date. The summary shows how many RFQs went out, how many came back, the response rate, and average days to respond. Overdue quotes and expired validity dates turn red so you know who to call.

Log the declines, too. A supplier who declines tells you something — the spec may be proprietary, the line may not be stocked locally, or the lead time is a problem.

Comparing quotes: total delivered, then scope

Total delivered is the right first cut — unit price alone ignores freight, cut and reel charges, and short validity. But the low total isn't the low quote if it excludes the lighting controls. Once quotes are in, level them line by line in the free Bid Leveling Matrix, which includes a supplier quote comparison sheet that finds the lowest price per line and ranks vendors on total delivered. Then add your markup — our markup vs. margin calculator keeps the two straight.

RFQ tips from the field

  • Send early. A supplier with a week gives you a better number than one with a day — and gear quotes need factory time.
  • Follow up two days before the due date. The log has a follow-up column for a reason.
  • Send the right documents. The RFQ plus the relevant spec sections, schedules, and one-line — not the whole 900-page set.
  • Ask for alternates separately. If you'll consider a substitution, ask for it as an alternate so the base quote stays comparable.
  • Re-confirm commodity pricing at award. Copper and steel quotes often have short validity; re-quote before you issue the PO.

From quote to purchase order

Once you award, the quote becomes a purchase order — and that's where tracking starts to matter. Field PM turns the awarded quote into a PO against your job budget by cost code, then matches receipts and vendor invoices to it, so you know what was bought, what was delivered, and what was billed. Start a free 30-day trial — no credit card required.